EFDC simulation of fishway in the Diversion Dahaerteng River to Danghe Reservoir, China

被引:16
|
作者
Song, Weiwei [1 ,2 ,3 ]
Xu, Qing [4 ]
Fu, Xingqian [5 ]
Wang, Changfangzi [1 ]
Pang, Yong [1 ]
Song, Dahao [5 ]
机构
[1] Hohai Univ, Coll Environm, Key Lab Integrated Regulat & Resource Dev Shallow, Minist Educ, Nanjing 210098, Jiangsu, Peoples R China
[2] Hohai Univ, Coll Hydrol & Water Resources, Nanjing 210098, Jiangsu, Peoples R China
[3] Univ Miami, Coll Engn, Coral Gables, FL 33146 USA
[4] Yangzhou Univ, Sch Hydraul Energy & Power Engn, Yangzhou 225009, Jiangsu, Peoples R China
[5] Jiangsu Normal Univ, Kewen Coll, Xuzhou 221116, Jiangsu, Peoples R China
关键词
Diversion Dahaerteng River to Danghe; Reservoir engineering project; Triplophysa; Nature-like; Fishway; Flow field simulation; EFDC model; VERTICAL-SLOT FISHWAY; PASSAGE PERFORMANCE; YANGTZE-RIVER; LAKE TAIHU; MODEL; FLOW; EUTROPHICATION; SEDIMENT; STURGEON; FISHES;
D O I
10.1016/j.ecolind.2019.03.025
中图分类号
X176 [生物多样性保护];
学科分类号
090705 ;
摘要
In order to mitigate the threat that hydraulic engineering will have on the fish's living environment, fish migration can be accomplished by building fishway. This paper takes the Diversion Dahaerteng River to Danghe Reservoir project in Gansu, China as an example. Through field investigation and data analysis, it was found that the main fish in the study area was Triplophysa. Through the comparison of the advantages and disadvantages of the fishways, it is determined that the fishway and the nature-like fishway are suitable. By constructing the evaluation method, the 19 indicators of the fishway were scored from the aspects of ability to lure fish, ability to pass fish, fish adaptability, engineering quantity, operation and maintenance, and the nature-like fishway was determined to be the best choice. The surface runoff from March to August is calculated by the P-III curve to simulate the flow field of the Dahaerteng River under the conditions of maximum, minimum and average runoff. The flow velocity of the simulation results is suitable for the Triplophysa migration, and the right bank is suitable for building nature-like fishway. The fishway section is rectangular, with a slope of 1%, a width of 2 m, and a total length of 520 m. It is arranged with a staggered baffle, and the revetment is rough masonry stones. The inside of the fishway is inlaid with pebbles so that the roughness of the fishway is more than 0.03. Then, numerical simulation calculations were carried out for the fishways composed of the partitions of 10m and 5m apart. The comparison shows that the fishway with the partition gap 5m is closer to the right bank of the river, which is suitable for Triplophysa migration and survival. For later evaluation and adjustment, an observation room and a fish collection pool are provided near the entrance of the fishway, and an observation room is provided near the exit. This paper can provide reference for the planning, construction and post evaluation of fishways.
引用
收藏
页码:704 / 715
页数:12
相关论文
共 50 条
  • [21] Experimental study of flood diversion in the middle and lower Han River, China
    Zhang, Jun-hong
    Yu, Ming-hui
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2014, 41 (05) : 381 - 388
  • [22] Ecohydrological responses on water diversion in the lower reaches of the Tarim River, China
    Tao, Hui
    Gemmer, Marco
    Song, Yudong
    Jiang, Tong
    WATER RESOURCES RESEARCH, 2008, 44 (08)
  • [23] Fish migration through a fish passage associated with water velocities at the Changzhou fishway (Pearl River, China)
    Tao, J. P.
    Tan, X. C.
    Yang, Z.
    Wang, X.
    Cai, Y. P.
    Qiao, Y.
    Chang, J. B.
    JOURNAL OF APPLIED ICHTHYOLOGY, 2015, 31 (01) : 72 - 76
  • [24] Closure to "Optimization of Water Diversion Based on Reservoir Operating Rules: Analysis of the Biliu River Reservoir, China" by Xueping Zhu, Chi Zhang, Junxian Yin, Huicheng Zhou, and Yunzhong Jiang
    Zhu, Xueping
    Zhang, Chi
    Yin, Junxian
    Zhou, Huicheng
    Jiang, Yunzhong
    JOURNAL OF HYDROLOGIC ENGINEERING, 2015, 20 (07)
  • [25] Discussion of optimization of water diversion based on reservoir operating rules: Analysis of the biliu river reservoir, China by Xueping Zhu, Chi Zhang, Junxian Yin, Huicheng Zhou, and Yunzhong Jiang
    Dept. of Irrigation and Reclamation Engineering, Faculty of Agricultural Engineering and Technology, College of Agriculture and Natural Resources, Univ. of Tehran, Karaj, Tehran, Iran
    不详
    J. Hydrol. Eng., 7
  • [26] THE INFLUENCE OF PARAMETER UNCERTAINTY ON PHOSPHORUS MODELING: A CASE STUDY OF EFDC MODEL APPLICATION TO THE THREE GORGES RESERVOIR REGION, CHINA
    Shen, Zhenyao
    Chen, Xiaofeng
    Zhao, Xin
    Xiong, Ming
    Liu, Ruimin
    Liao, Qian
    FRESENIUS ENVIRONMENTAL BULLETIN, 2014, 23 (1A): : 264 - 273
  • [27] Discussion of optimization of water diversion based on reservoir operating rules: Analysis of the biliu river reservoir, China by Xueping Zhu, Chi Zhang, Junxian Yin, Huicheng Zhou, and Yunzhong Jiang
    Dept. of Irrigation and Reclamation Engineering, Faculty of Agricultural Engineering and Technology, College of Agriculture and Natural Resources, Univ. of Tehran, Karaj, Tehran
    3158777871, Iran
    J. Hydrol. Eng., 7
  • [28] Blast testing and numerical simulation analysis of diversion tunnel upper section for Qianping reservoir
    Ma W.-L.
    Yang Q.-G.
    Zhang G.-Y.
    Ma, Wen-Liang (mawenliangj@aliyun.com), 1600, Inderscience Publishers (37): : 70 - 83
  • [29] Study on operating and scheduling simulation models of big complex river diversion project
    Zhang, C.
    Chen, W.
    Shuikexue Jinzhan/Advances in Water Science, 2001, 12 (02): : 215 - 221
  • [30] Water from TGP reservoir to Weihe, Yellow River and Northern China diversion project - A new scheme of Water Transfer Project from South to North
    Huang, Bo-Ming
    Zhao, Ye-An
    Liu, Chong-Xi
    Zhou, Xing-Zhi
    Changjiang Kexueyuan Yuanbao/ Journal of Yangtze River Scientific Research Institute, 2002, 19 (06):