共 50 条
- [34] Estimation of Excavation Disturbed Zone of High Slope in the Left Bank of Jinping-1 Hydropower Station ADVANCES IN HYDROLOGY AND HYDRAULIC ENGINEERING, PTS 1 AND 2, 2012, 212-213 : 998 - +
- [38] Simulation feedback analysis of II1-II1 slope at left bank of Jinping I hydropower station during the construction period ADVANCES IN HYDROLOGY AND HYDRAULIC ENGINEERING, PTS 1 AND 2, 2012, 212-213 : 863 - 872
- [40] Focal mechanism determination for microseismic events and its application to the left bank slope of the Baihetan hydropower station in China Environmental Earth Sciences, 2018, 77