Sensor network optimal design of microseismic monitoring system at the left slope of Jinping I hydropower station

被引:2
|
作者
He, Gang [1 ]
Xu, Nuwen
Sha, Chun [1 ]
Tian, Li
机构
[1] HydroChina Chengdu Engn Corp, Chengdu 610072, Sichuan, Peoples R China
基金
中国国家自然科学基金;
关键词
Jinping I hydropower station; rock slope; microseismic monitoring; sensor; optimal design;
D O I
10.4028/www.scientific.net/AMM.353-356.872
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In order to real time monitor and analyze the rock fracturing due to continuous construction and consolidation at the left slope of Jinping I hydropower station, southwest of China, a microseismic monitoring system was conducted and an optimal design for the sensor arrays was investigated. The sensor array was designed on the basis of P method and Powell algorithm. The artificial fixed blasting tests were applied to adjust the positioning accuracy of the monitoring system. The results show that the location error of seismic source is less than 12 m in the scope of the sensor array, which demonstrates the monitoring system has high positioning g accuracy. The contour of source location shows that the location errors near the main tunnels at the left bank slope is below 6 m. Signals from 689 microseismic events with moment magnitude ranging from -2.1 to -0.2 were recorded during the first year monitoring period from June 15, 2009. The spatial distribution of microseismicity can identify and delineate the potential failure at the left bank slope, which provides some references for the future excavation and consolidation of the hydropower station.
引用
收藏
页码:872 / +
页数:2
相关论文
共 50 条
  • [21] Analyzing the slope stability of Jinping I hydropower station with the zone safety factor
    Fu, Mengmeng
    DISASTER ADVANCES, 2013, 6 (11): : 89 - 100
  • [22] Rockburst characteristics and microseismic monitoring of deep-buried tunnels for Jinping II Hydropower Station
    Ma, T. H.
    Tang, C. A.
    Tang, L. X.
    Zhang, W. D.
    Wang, L.
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2015, 49 : 345 - 368
  • [23] Research on Characteristic of Rockburst & Rules of Microseismic Monitoring at Headrace Tunnels in Jinping II Hydropower Station
    Zhang Wen-dong
    Ma Tian-hui
    2013 FOURTH INTERNATIONAL CONFERENCE ON DIGITAL MANUFACTURING AND AUTOMATION (ICDMA), 2013, : 1039 - 1042
  • [24] Stability analysis on the left bank slope of Baihetan hydropower station based on discrete element simulation and microseismic monitoring
    Xu N.-W.
    Li T.
    Dai F.
    Li B.
    Fan Y.-L.
    Xu J.
    1600, Academia Sinica (38): : 2358 - 2367
  • [25] Mechanism of deep cracks in the left bank slope of Jinping first stage hydropower station
    Qi, SW
    Wu, FQ
    Yan, FZ
    Lan, HX
    ENGINEERING GEOLOGY, 2004, 73 (1-2) : 129 - 144
  • [26] Microseismic Monitoring of Energy Changes in Deep Tunnels during the TBM Tunneling of the Jinping II Hydropower Station
    Zhuang, Duanyang
    Ma, Ke
    Tang, Chunan
    Liang, Zhengzhao
    Wang, Zhenwei
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [27] Study on the mechanism of the deep fractures of the left abutment slope at the Jinping first stage hydropower station
    Qi, Sheng-Wen
    Wu, Fa-Quan
    Lan, Heng-Xing
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2002, 24 (05):
  • [28] Stability control based excavation of left bank slope at Jinping-1 hydropower station
    Liu, Yong-Lin
    Xiang, Jian
    Huang, He-Cheng
    Liao, Wen-Xiao
    Li, Hong-Tao
    Wu, Jun
    Electronic Journal of Geotechnical Engineering, 2014, 19 (Z6): : 17643 - 17656
  • [29] Application of the CSMR system to slope stability evaluation for Jinping First Cascade Hydropower Station
    Zhang, Wen-Jie
    Zhou, Chuang-Bing
    Rong, Guan
    Yantu Lixue/Rock and Soil Mechanics, 2005, 26 (SUPPL. 2): : 95 - 97
  • [30] Nucleation process of rockbursts based on microseismic monitoring of deep-buried tunnels for Jinping II Hydropower Station
    Yu, Qun
    Tang, Chun-An
    Li, Lian-Chong
    Li, Hong
    Cheng, Guan-Wen
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2014, 36 (12): : 2315 - 2322