Scheduling: Agreement graph vs resource constraints

被引:10
|
作者
Behdraouche, Mohamed [1 ,2 ]
Boudhar, Mourad [2 ]
Oulamara, Ammar [3 ]
机构
[1] Saad Dahleb Univ, Fac Sci, Blida, Algeria
[2] USTHB Univ, RECITS Lab, Algiers, Algeria
[3] Univ Lorraine, Loria Lab, Nancy, France
关键词
Scheduling; Complexity theory; Identical machines; Agreement graph; Resource constraints; PRESPECIFIED PROCESSOR ALLOCATIONS; MULTIPROCESSOR TASKS; COMPLEXITY; ALGORITHM;
D O I
10.1016/j.ejor.2014.07.003
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We investigate two scheduling problems. The first is scheduling with agreements (SWA) that consists in scheduling a set of jobs non-preemptively on identical machines in a minimum time, subject to constraints that only some specific jobs can be scheduled concurrently. These constraints are represented by an agreement graph. We extend the NP-hardness of SWA with three distinct values of processing times to only two values and this definitely closes the complexity status of SWA on two machines with two fixed processing times. The second problem is the so-called resource-constrained scheduling. We prove that SWA is polynomially equivalent to a special case of the resource-constrained scheduling and deduce new complexity results of the latter. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:355 / 360
页数:6
相关论文
共 50 条
  • [11] A practical resource scheduling with OPF constraints
    AbdulRahman, KH
    Shahidehpour, SM
    Aganagic, M
    Mokhtari, S
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (01) : 254 - 259
  • [12] FUEL RESOURCE SCHEDULING WITH EMISSION CONSTRAINTS
    VICKERS, VL
    HOBBS, WJ
    VEMURI, S
    TODD, DL
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1994, 9 (03) : 1531 - 1538
  • [13] Restricted assignment scheduling with resource constraints
    Dosa, Gyorgy
    Kellerer, Hans
    Tuza, Zsolt
    THEORETICAL COMPUTER SCIENCE, 2019, 760 : 72 - 87
  • [15] Multicast scheduling with resource fairness constraints
    Vladimir Vukadinović
    Gunnar Karlsson
    Wireless Networks, 2009, 15 : 571 - 583
  • [16] Integrated resource management and scheduling with multi-resource constraints
    Ghosh, S
    Hansen, J
    Rajkumar, R
    Lehoczky, J
    25TH IEEE INTERNATIONAL REAL-TIME SYSTEMS SYMPOSIUM, PROCEEDINGS, 2004, : 12 - 22
  • [17] Transformation of the network graph of scheduling problems with precedence constraints to a planar graph
    Lazarev, A. A.
    Gafarov, E. R.
    DOKLADY MATHEMATICS, 2009, 79 (01) : 1 - 3
  • [18] Transformation of the network graph of scheduling problems with precedence constraints to a planar graph
    A. A. Lazarev
    E. R. Gafarov
    Doklady Mathematics, 2009, 79 : 1 - 3
  • [19] Business Process Scheduling with Resource Availability Constraints
    Xu, Jiajie
    Liu, Chengfei
    Zhao, Xiaohui
    Yongchareon, Sira
    ON THE MOVE TO MEANINGFUL INTERNET SYSTEMS: OTM 2010, PT I, 2010, 6426 : 419 - +
  • [20] SCHEDULING UNDER RESOURCE CONSTRAINTS AND MODULE ASSIGNMENT
    BERGAMASCHI, RA
    CAMPOSANO, R
    PAYER, M
    INTEGRATION-THE VLSI JOURNAL, 1991, 12 (01) : 1 - 19