A practical resource scheduling with OPF constraints

被引:65
作者
AbdulRahman, KH [1 ]
Shahidehpour, SM [1 ]
Aganagic, M [1 ]
Mokhtari, S [1 ]
机构
[1] IIT, DEPT ELECT & COMP ENGN, CHICAGO, IL 60616 USA
关键词
resource scheduling; augmented Lagrangian relaxation; fuel constraints; OFF constraints;
D O I
10.1109/59.486103
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents an efficient approach to short term resource scheduling based on the augmented Lagrangian relaxation method. The problem is divided into two stages, the commitment stage and the constrained economic dispatch stage. The proposed mathematical model incorporates optimal power flow (OPF) constraints in the unit commitment stage. By OPF constrains, we refer to the relevant active power constraints that are incorporated in the constrained economic dispatch stage (i.e. transmission capacity constraints, fuel and various regulated emission requirements). The inclusion of OPF constraints in the commitment stage will improve the feasibility of the constrained economic dispatch solution. Other unit commitment constraints such as spinning and operating reserve requirements; power balance as well as other relevant local constraints (i.e. unit ramping rates, upper and lower generation limits, minimum up and down times) are taken into account in the proposed model. As we deal with a larger number of constraints, a more rigorous method is introduced for updating Lagrange multipliers to improve the solution convergence. A software package which addresses energy management systems requirements is developed and tested.
引用
收藏
页码:254 / 259
页数:6
相关论文
共 10 条
[1]  
[Anonymous], 1979, IEEE T POWER AP SYST, V98, P2047, DOI 10.1109/TPAS.1979.319398
[2]   DAILY GENERATION SCHEDULING OPTIMIZATION WITH TRANSMISSION CONSTRAINTS - A NEW CLASS OF ALGORITHMS [J].
BATUT, J ;
RENAUD, A .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (03) :982-989
[3]   A NEW METHOD FOR UNIT COMMITMENT AT ELECTRICITE DE FRANCE [J].
MERLIN, A ;
SANDRIN, P .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1983, 102 (05) :1218-1225
[4]   AN INNOVATIVE APPROACH TO GENERATION SCHEDULING IN LARGE-SCALE HYDROTHERMAL POWER-SYSTEMS WITH FUEL CONSTRAINED UNITS [J].
TONG, SK ;
SHAHIDEHPOUR, SM .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1990, 5 (02) :665-673
[5]   IMPLEMENTATION OF A LAGRANGIAN-RELAXATION BASED UNIT COMMITMENT PROBLEM [J].
VIRMANI, S ;
ADRIAN, EC ;
IMHOF, K ;
MUKHERJEE, S .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1989, 4 (04) :1373-1380
[6]   RAMP-RATE LIMITS IN UNIT COMMITMENT AND ECONOMIC-DISPATCH INCORPORATING ROTOR FATIGUE EFFECT [J].
WANG, C ;
SHAHIDEHPOUR, SM .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1994, 9 (03) :1539-1545
[7]   EFFECTS OF RAMP-RATE LIMITS ON UNIT COMMITMENT AND ECONOMIC-DISPATCH [J].
WANG, C ;
SHAHIDEHPOUR, SM .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1993, 8 (03) :1341-1350
[8]  
WANG SJ, 1994, IEEE PES 1994 SUMM M
[9]  
Zhu D. L., 1984, ADV LARGE SCALE SYST, VI, P203
[10]   TOWARDS A MORE RIGOROUS AND PRACTICAL UNIT COMMITMENT BY LAGRANGIAN-RELAXATION [J].
ZHUANG, FL ;
GALIANA, FD .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (02) :763-773