A Competitive Model of Customization with Lead-Time Effects

被引:10
|
作者
Xia, Nan [2 ]
Rajagopalan, Sampath [1 ]
机构
[1] Univ So Calif, Marshall Sch Business, Los Angeles, CA 90089 USA
[2] Univ Wisconsin, Lubar Sch Business, Milwaukee, WI 53211 USA
关键词
Customization; Lead Time and Product Variety; Noncooperative Games; and Pricing; PRICE-COMPETITION; SPATIAL COMPETITION; MASS CUSTOMIZATION; VARIETY; ORDER;
D O I
10.1111/j.1540-5915.2009.00249.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this article, we study the competitive interactions between a firm producing standard products and a firm producing custom products. Consumers with heterogeneous preferences choose between n standard products, which may not meet their preferences exactly but are available immediately, and a custom product, available only after a certain lead time l. Standard products incur a variety cost that increases with n and custom products incur a lead time cost that is decreasing in the lead time l. We consider a two-stage game wherein at stage 1, the standard product firm chooses the variety and the custom firm chooses the lead time and then both firms set prices simultaneously. We characterize the subgame-perfect Nash equilibrium of the game. We find that both firms can coexist in equilibrium, either sharing the market as local monopolists or in a price-competitive mode. The standard product firm may offer significant or minimal variety depending on the equilibrium outcome. We provide several interesting insights on the variety, lead time, and prices of the products offered and on the impact of problem parameters on the equilibrium outcomes. For instance, we show that the profit margin and price of the custom product are likely to be higher than that of standard products in equilibrium under certain conditions. Also, custom firms are more likely to survive and succeed in product markets with larger potential market sizes. Another interesting insight is that increased consumer sensitivity to product fit may result in lower lead time for the custom product.
引用
收藏
页码:727 / 758
页数:32
相关论文
共 50 条
  • [41] The impact of lead-time uncertainty in product configuration
    Song, Qinyu
    Ni, Yaodong
    Ralescu, Dan A.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (03) : 959 - 981
  • [42] Inventory model with stochastic lead-time and price dependent demand incorporating advance payment
    Maiti, A. K.
    Maiti, M. K.
    Maiti, M.
    APPLIED MATHEMATICAL MODELLING, 2009, 33 (05) : 2433 - 2443
  • [43] An integrated vendor-buyer cooperative model under stochastic supply lead-time
    Sajadieh, Mohsen Sheikh
    Jokar, Mohammad Reza Akbari
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (9-10): : 1043 - 1050
  • [44] Competitive customization
    Mendelson, Haim
    Parlaktuerk, Ali K.
    M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2008, 10 (03) : 377 - 390
  • [45] Supply chain coordination model for Newsvendor-type products with lead-time compression
    Wang, Sheng-Dong
    Zhou, Yong-Wu
    Kongzhi yu Juece/Control and Decision, 2010, 25 (09): : 1292 - 1296
  • [46] A note on a buyer-vendor EOQ model with changeable lead-time in supply chain
    Huang, Yung-Fu
    Hsu, Kuang-Hua
    JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES, 2008, 29 (02): : 305 - 310
  • [47] (Q, r, L) model for stochastic demand with lead-time dependent partial backlogging
    Sana, Shib Sankar
    Goyal, Suresh Kumar
    ANNALS OF OPERATIONS RESEARCH, 2015, 233 (01) : 401 - 410
  • [48] Inter-dependent lead-time and ordering cost reduction strategy: a supply chain model with quality control, lead-time dependent backorder and price-sensitive stochastic demand
    Monami Das Roy
    Shib Sankar Sana
    OPSEARCH, 2021, 58 : 690 - 710
  • [49] Promised lead-time contracts under asymmetric information
    Lutze, Holly
    Ozer, Ozalp
    OPERATIONS RESEARCH, 2008, 56 (04) : 898 - 915
  • [50] Lead-time analysis and a control policy for production lines
    Economopoulos, Angelos A.
    Kouikoglou, Vassilis S.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (07) : 2019 - 2034