A Competitive Model of Customization with Lead-Time Effects

被引:10
|
作者
Xia, Nan [2 ]
Rajagopalan, Sampath [1 ]
机构
[1] Univ So Calif, Marshall Sch Business, Los Angeles, CA 90089 USA
[2] Univ Wisconsin, Lubar Sch Business, Milwaukee, WI 53211 USA
关键词
Customization; Lead Time and Product Variety; Noncooperative Games; and Pricing; PRICE-COMPETITION; SPATIAL COMPETITION; MASS CUSTOMIZATION; VARIETY; ORDER;
D O I
10.1111/j.1540-5915.2009.00249.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this article, we study the competitive interactions between a firm producing standard products and a firm producing custom products. Consumers with heterogeneous preferences choose between n standard products, which may not meet their preferences exactly but are available immediately, and a custom product, available only after a certain lead time l. Standard products incur a variety cost that increases with n and custom products incur a lead time cost that is decreasing in the lead time l. We consider a two-stage game wherein at stage 1, the standard product firm chooses the variety and the custom firm chooses the lead time and then both firms set prices simultaneously. We characterize the subgame-perfect Nash equilibrium of the game. We find that both firms can coexist in equilibrium, either sharing the market as local monopolists or in a price-competitive mode. The standard product firm may offer significant or minimal variety depending on the equilibrium outcome. We provide several interesting insights on the variety, lead time, and prices of the products offered and on the impact of problem parameters on the equilibrium outcomes. For instance, we show that the profit margin and price of the custom product are likely to be higher than that of standard products in equilibrium under certain conditions. Also, custom firms are more likely to survive and succeed in product markets with larger potential market sizes. Another interesting insight is that increased consumer sensitivity to product fit may result in lower lead time for the custom product.
引用
收藏
页码:727 / 758
页数:32
相关论文
共 50 条
  • [31] A buyer-vendor EOQ model with changeable lead-time in supply chain
    J.M. Hsiao
    C. Lin
    The International Journal of Advanced Manufacturing Technology, 2005, 26 : 917 - 921
  • [32] Inventory Control when the Lead-time Changes
    Axsater, Sven
    PRODUCTION AND OPERATIONS MANAGEMENT, 2011, 20 (01) : 72 - 80
  • [33] Lead-time bias in studies of cinacalcet prescriptions
    Evans, Marie
    Fored, Carl Michael
    KIDNEY INTERNATIONAL, 2010, 78 (06) : 535 - 537
  • [34] Modelling Freight Allocation and Transportation Lead-Time
    Burinskiene, Aurelija
    Burinskas, Arunas
    TEHNICKI GLASNIK-TECHNICAL JOURNAL, 2023, 17 (03): : 440 - 446
  • [35] INCREASING THE LEAD-TIME IN GASTRIC-CANCER
    DEUTSCH, E
    WALKER, J
    GASTROENTEROLOGY, 1981, 80 (05) : 1135 - 1135
  • [36] LEAD-TIME - A JOURNALISTS EDUCATION - WILLS,G
    SHERRILL, R
    NEW YORK TIMES BOOK REVIEW, 1983, 88 (27): : 2 - &
  • [37] Lead-time in prostate cancer screening (Finland)
    Auvinen, A
    Määttänen, L
    Stenman, UH
    Tammela, T
    Rannikko, S
    Aro, J
    Juusela, H
    Hakama, M
    CANCER CAUSES & CONTROL, 2002, 13 (03) : 279 - 285
  • [38] A buyer-vendor EOQ model with changeable lead-time in supply chain
    Hsiao, JM
    Lin, C
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 26 (7-8): : 917 - 921
  • [39] Assessing lead-time for predicting wheat growth using a crop simulation model
    Lawless, C
    Semenov, MA
    AGRICULTURAL AND FOREST METEOROLOGY, 2005, 135 (1-4) : 302 - 313
  • [40] Lead-time and overdiagnosis estimation in neuroblastoma screening
    Spix, C
    Michaelis, J
    Berthold, F
    Erttmann, R
    Sander, J
    Schilling, FH
    STATISTICS IN MEDICINE, 2003, 22 (18) : 2877 - 2892