A two-stage scheduling method for hot rolling and its application

被引:33
|
作者
Zhao, Jun [1 ]
Wang, Wei [1 ]
Liu, Quanli [1 ]
Wang, Zhigang [1 ]
Shi, Peng [2 ]
机构
[1] Dalian Univ Technol, Res Ctr Informat & Control, Dalian 116024, Peoples R China
[2] Univ Glamorgan, Dept Comp & Math Sci, Pontypridd CF37 1DL, M Glam, Wales
基金
中国国家自然科学基金;
关键词
Hot rolling production scheduling; Vehicle routing problem with time windows; Heuristics; Intelligent search algorithms; TRAVELING SALESMAN PROBLEM; VEHICLE-ROUTING PROBLEM; STEEL PRODUCTION; TIME WINDOWS; ALGORITHM;
D O I
10.1016/j.conengprac.2008.10.014
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Hot rolling scheduling is a difficult problem in the steel processing industry. It involves many objectives and constraints in both technical and practical respects. A two-stage scheduling method is proposed in this paper. Batch planning of staple material is formulated as a VRPTW, which is solved with a modified PGA. Then, batches of the established units are optimized by adjusting rolling sequences using intelligent search algorithms to reach higher hot charge ratios. This method has been applied to a hot strip mill belonging to Baosteel in China. Our results demonstrate that the proposed technique can improve production efficiency and offer significant economic benefits. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:629 / 641
页数:13
相关论文
共 50 条
  • [21] Two-stage stochastic master production scheduling under demand uncertainty in a rolling planning environment
    Englberger, Julian
    Herrmann, Frank
    Manitz, Michael
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (20) : 6192 - 6215
  • [22] Rolling planning method for two-stage logistics system under unsteady demand
    Islam, Md Mohibul
    Arakawa, Masahiro
    JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2021, 15 (03)
  • [23] Two stage bee colony algorithm for hot rolling scheduling problem in compact strip production
    Liang, Wang
    Qian, Bin
    Hu, Rong
    Zhang, Ziqi
    Zhang, Changsheng
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2025, 31 (01): : 102 - 116
  • [24] Voltage divider and its application in the two-stage power architecture
    Xu, M
    Sun, JL
    Lee, FC
    APEC 2006: TWENTY-FIRST ANNUAL IEEE APPLIED POWER ELECTRONICS CONFERENCE AND EXPOSITION, VOLS 1-3, 2006, : 499 - 505
  • [25] Application of genetic algorithms to strip hot rolling scheduling
    Carreon, Carlos A. Hernandez
    Huacuja, Hector J. Fraire
    Fernandez, Karla Espriella
    Valdez, Guadalupe Castilla
    Tolama, Juana E. Mancilla
    INNOVATIONS IN HYBRID INTELLIGENT SYSTEMS, 2007, 44 : 247 - +
  • [26] The Method to Estimate the Sample Size in Stratified Two-stage Sampling and Its Application in Medical Survey
    Fan Yubo
    Gao Ge
    RECENT ADVANCE IN STATISTICS APPLICATION AND RELATED AREAS, VOLS I AND II, 2009, : 1070 - 1075
  • [27] Two Hybrid Metaheuristic Algorithms for Hot Rolling Scheduling
    Tang, Lixin
    Zhang, Xiaoxia
    Guo, Qingxin
    ISIJ INTERNATIONAL, 2009, 49 (04) : 529 - 538
  • [28] Two-stage application of the optimised uncertainty method: a practical assessment
    Lyn, JA
    Ramsey, MH
    Damant, AP
    Wood, R
    ANALYST, 2005, 130 (09) : 1271 - 1279
  • [29] Scheduling two-stage jobs on multiple flowshops
    Wu, Guangwei
    Chen, Jianer
    Wang, Jianxin
    THEORETICAL COMPUTER SCIENCE, 2019, 776 : 117 - 124
  • [30] Bicriteria in a two-stage flowshop scheduling problem
    Bagga, PC
    Bhambani, A
    INDIAN JOURNAL OF PURE & APPLIED MATHEMATICS, 2000, 31 (11): : 1475 - 1481