Two-stage stochastic master production scheduling under demand uncertainty in a rolling planning environment

被引:23
|
作者
Englberger, Julian [1 ]
Herrmann, Frank [1 ]
Manitz, Michael [2 ]
机构
[1] OTH Regensburg, Innovat & Competence Ctr Prod Logist & Factory Pl, Regensburg, Germany
[2] Univ Duisburg Essen, Mercator Sch Management, Duisburg, Germany
关键词
Master production scheduling; demand uncertainty; two-stage stochastic programming; scenario-based stochastic programming with recourse; hierarchical production planning; ROBUST OPTIMIZATION MODEL; SIMULATION;
D O I
10.1080/00207543.2016.1162917
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper proposes a scenario-based two-stage stochastic programming model with recourse for master production scheduling under demand uncertainty. We integrate the model into a hierarchical production planning and control system that is common in industrial practice. To reduce the problem of the disaggregation of the master production schedule, we use a relatively low aggregation level (compared to other work on stochastic programming for production planning). Consequently, we must consider many more scenarios to model demand uncertainty. Additionally, we modify standard modelling approaches for stochastic programming because they lead to the occurrence of many infeasible problems due to rolling planning horizons and interdependencies between master production scheduling and successive planning levels. To evaluate the performance of the proposed models, we generate a customer order arrival process, execute production planning in a rolling horizon environment and simulate the realisation of the planning results. In our experiments, the tardiness of customer orders can be nearly eliminated by the use of the proposed stochastic programming model at the cost of increasing inventory levels and using additional capacity.
引用
收藏
页码:6192 / 6215
页数:24
相关论文
共 50 条
  • [1] A master production scheduling procedure for stochastic demand and rolling planning horizons
    Vargas, Vicente
    Metters, Richard
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 132 (02) : 296 - 302
  • [2] Two-stage workforce planning under demand fluctuations and uncertainty
    Zhu, X.
    Sherali, H. D.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2009, 60 (01) : 94 - 103
  • [3] A two-stage recourse model for production planning with stochastic demand
    Lai, KK
    Leung, SCH
    Wu, Y
    COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2005, VOL 4, PROCEEDINGS, 2005, 3483 : 250 - 260
  • [4] Two-Stage Production Planning Under Stochastic Demand: Case Study of Fertilizer Manufacturing
    Wang, Chia-Nan
    Syu, Shao-Dong
    Chou, Chien-Chang
    Viet Tinh Nguyen
    Dang Van Thuy Cuc
    CMC-COMPUTERS MATERIALS & CONTINUA, 2022, 70 (01): : 1195 - 1207
  • [5] A two-stage stochastic programming project scheduling approach to production planning
    Alfieri, Arianna
    Tolio, Tullio
    Urgo, Marcello
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 62 (1-4): : 279 - 290
  • [6] Two-stage stochastic programming model for the regional-scale electricity planning under demand uncertainty
    Huang, Yun-Hsun
    Wu, Jung-Hua
    Hsu, Yu-Ju
    ENERGY, 2016, 116 : 1145 - 1157
  • [7] A two-stage stochastic programming project scheduling approach to production planning
    Arianna Alfieri
    Tullio Tolio
    Marcello Urgo
    The International Journal of Advanced Manufacturing Technology, 2012, 62 : 279 - 290
  • [8] Rolling planning method for two-stage logistics system under unsteady demand
    Islam, Md Mohibul
    Arakawa, Masahiro
    JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2021, 15 (03)
  • [9] A TWO-STAGE STOCHASTIC PROGRAMMING APPROACH FOR PRODUCTION PLANNING SYSTEM WITH SEASONAL DEMAND
    Mahmoud, Asmaa A.
    Aly, Mohamed F.
    Mohib, Ahmed M.
    Afefy, Islam H.
    MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2020, 11 (01) : 31 - 42
  • [10] Production planning with a two-stage stochastic programming model in a kitting facility under demand and yield uncertainties
    Hu, Zhengyang
    Ramaraj, Goutham
    Hu, Guiping
    INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2020, 15 (03) : 237 - 246