Two-stage stochastic master production scheduling under demand uncertainty in a rolling planning environment

被引:23
|
作者
Englberger, Julian [1 ]
Herrmann, Frank [1 ]
Manitz, Michael [2 ]
机构
[1] OTH Regensburg, Innovat & Competence Ctr Prod Logist & Factory Pl, Regensburg, Germany
[2] Univ Duisburg Essen, Mercator Sch Management, Duisburg, Germany
关键词
Master production scheduling; demand uncertainty; two-stage stochastic programming; scenario-based stochastic programming with recourse; hierarchical production planning; ROBUST OPTIMIZATION MODEL; SIMULATION;
D O I
10.1080/00207543.2016.1162917
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper proposes a scenario-based two-stage stochastic programming model with recourse for master production scheduling under demand uncertainty. We integrate the model into a hierarchical production planning and control system that is common in industrial practice. To reduce the problem of the disaggregation of the master production schedule, we use a relatively low aggregation level (compared to other work on stochastic programming for production planning). Consequently, we must consider many more scenarios to model demand uncertainty. Additionally, we modify standard modelling approaches for stochastic programming because they lead to the occurrence of many infeasible problems due to rolling planning horizons and interdependencies between master production scheduling and successive planning levels. To evaluate the performance of the proposed models, we generate a customer order arrival process, execute production planning in a rolling horizon environment and simulate the realisation of the planning results. In our experiments, the tardiness of customer orders can be nearly eliminated by the use of the proposed stochastic programming model at the cost of increasing inventory levels and using additional capacity.
引用
收藏
页码:6192 / 6215
页数:24
相关论文
共 50 条
  • [11] A Two-Stage Method of Dimensioning and Scheduling Service Providers under Patient Demand Uncertainty
    Shirneshan, Hajar
    Sadegheih, Ahmad
    Hoseini Nasab, Hasan
    Lotfi, Mohammad Mehdi
    Computational Intelligence and Neuroscience, 2022, 2022
  • [12] A Two-Stage Method of Dimensioning and Scheduling Service Providers under Patient Demand Uncertainty
    Shirneshan, Hajar
    Sadegheih, Ahmad
    Hoseini Nasab, Hasan
    Lotfi, Mohammad Mehdi
    COMPUTATIONAL INTELLIGENCE AND NEUROSCIENCE, 2022, 2022
  • [13] Planning and replanning the master production schedule under demand uncertainty
    Tang, O
    Grubbström, RW
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 78 (03) : 323 - 334
  • [14] Two-Stage Stochastic Program for Dynamic Coordinated Traffic Control Under Demand Uncertainty
    Li, Lubing
    Huang, Wei
    Chow, Andy H. F.
    Lo, Hong K.
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2022, 23 (08) : 12966 - 12976
  • [15] A two-stage stochastic programming model for lot-sizing and scheduling under uncertainty
    Hu, Zhengyang
    Hu, Guiping
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2016, 180 : 198 - 207
  • [16] A two-stage stochastic programming model for the optimal planning of a coal-to-liquids supply chain under demand uncertainty
    Zhou, Xingyuan
    Zhang, Haoran
    Qiu, Rui
    Lv, Mengyun
    Xiang, Chengcheng
    Long, Yin
    Liang, Yongtu
    JOURNAL OF CLEANER PRODUCTION, 2019, 228 : 10 - 28
  • [17] A two-stage skilled manpower planning model with demand uncertainty
    Sadeghi-Dastaki, Mohsen
    Afrazeh, Abbas
    INTERNATIONAL JOURNAL OF INTELLIGENT COMPUTING AND CYBERNETICS, 2018, 11 (04) : 526 - 551
  • [18] Two-stage Stochastic Optimization for Operation Scheduling and Capacity Allocation of Integrated Energy Production Unit Considering Supply and Demand Uncertainty
    Zuo F.
    Zhang Y.
    Zhao Q.
    Sun L.
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2022, 42 (22): : 8205 - 8214
  • [19] Setting planned orders in master production scheduling under demand uncertainty
    Feng, Keli
    Rao, Uday S.
    Raturi, Amitabh
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (13) : 4007 - 4025
  • [20] Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain
    Sahin, Funda
    Robinson, E. Powell
    Gao, Li-Lian
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 115 (02) : 528 - 541