Optimization of dewatering schemes for a deep foundation pit near the Yangtze River, China

被引:25
|
作者
You, Yang [1 ]
Yan, Changhong [1 ]
Xu, Baotian [1 ]
Liu, Shi [2 ]
Che, Canhui [2 ]
机构
[1] Nanjing Univ, Sch Earth Sci & Engn, Nanjing 210046, Jiangsu, Peoples R China
[2] Anhui Hydrogeol & Engn Geol Corp, Nanjing Branch, Nanjing 210019, Jiangsu, Peoples R China
关键词
Deep foundation pit; Parameter calculation; Dewatering schemes; Numerical simulation; NUMERICAL-SIMULATION; CONFINED AQUIFER; SETTLEMENT; CONSTRUCTION; WALL;
D O I
10.1016/j.jrmge.2018.02.002
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
A deep foundation pit constructed for an underground transportation hub was excavated near the Yangtze River. Among the strata, there are two confined aquifers, between which lies an aquiclude that is partially missing. To guarantee the safety of pit excavation, the piezometric head of the upper confined aquifer, where the pit bottom is located, should be 1 m below the pit bottom, while that of the lower confined aquifer should be dewatered down to a safe water level to avoid uplift problem. The Yangtze River levee is notably close to the pit, and its deformation caused by dewatering should be controlled. A pumping test was performed to obtain the hydraulic conductivity of the upper confined aquifer. The average value of the hydraulic conductivity obtained from analytical calculation is 20.45 m/d, which is larger than the values from numerical simulation (horizontal hydraulic conductivity K-H = 16 m/d and vertical hydraulic conductivity K-V = 8 m/d). The difference between K-H and K-V indicates the anisotropy of the aquifer. Two dewatering schemes were designed for the construction and simulated by the numerical models for comparison purposes. The results show that though the first scheme could meet the dewatering requirements, the largest accumulated settlement and differential settlement would be 94.64 mm and 3.3 parts per thousand, respectively, greatly exceeding the limited values. Meanwhile, the second scheme, in which the bottoms of the waterproof curtains in ramp B and the river side of ramp A are installed at a deeper elevation of -28 m above sea level, and 27 recharge wells are set along the levee, can control the deformation of the levee significantly. (C) 2018 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting by Elsevier B.V.
引用
收藏
页码:555 / 566
页数:12
相关论文
共 50 条
  • [1] Optimization of dewatering schemes for a deep foundation pit near the Yangtze River, China
    Yang You
    Changhong Yan
    Baotian Xu
    Shi Liu
    Canhui Che
    Journal of Rock Mechanics and Geotechnical Engineering, 2018, 10 (03) : 555 - 566
  • [2] Divisional dewatering technology for ultra deep foundation pit in floodplain areas along the Yangtze River
    Geng, Huiyong
    Yue, Qude
    Modern Tunnelling Technology, 2014, 51 : 495 - 500
  • [3] Deformation Characteristics of Ultra-Deep Foundation Pit in Yangtze River Floodplain with Multi-grade Dewatering
    Tao Yang
    Liyuan Tong
    Hongbo Che
    Xin Yan
    Dan Li
    Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2022, 46 : 3789 - 3804
  • [4] Deformation Characteristics of Ultra-Deep Foundation Pit in Yangtze River Floodplain with Multi-grade Dewatering
    Yang, Tao
    Tong, Liyuan
    Che, Hongbo
    Yan, Xin
    Li, Dan
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2022, 46 (05) : 3789 - 3804
  • [5] Recharging technique for settlement control of adjacent buildings under dewatering of deep foundation pit in floodplain area of the Yangtze River
    Wan, Yuqing
    Modern Tunnelling Technology, 2014, 51 : 490 - 494
  • [6] Optimization schemes for deep foundation pit dewatering under complicated hydrogeological conditions using MODFLOW-USG
    Chen, Zhou
    Huang, Jintao
    Zhan, Hongbin
    Wang, Jinguo
    Dou, Zhi
    Zhang, Chuanjian
    Chen, Changsheng
    Fu, Yesheng
    ENGINEERING GEOLOGY, 2022, 303
  • [7] Study on Deep Well Dewatering Optimization Design in Deep Foundation Pit and Engineering Application
    Hu Chunlin Yang HuijunInstitute of Rock and Soil Engineering
    Journal of China University of Geosciences, 2002, (01) : 82 - 86
  • [8] Optimization of a deep foundation pit dewatering scheme in gypsum-bearing strata
    Ping, Shifei
    Wang, Fugang
    Wang, Donghui
    Li, Shengwei
    Yuan, Yilong
    Wu, Mingjie
    Pan, Huilin
    Cao, Yuqing
    ENVIRONMENTAL EARTH SCIENCES, 2024, 83 (01)
  • [9] Optimization of dewatering wells in deep foundation pit considering effect of retaining structure
    Wang, Kang-Da, 1600, Chinese Society of Civil Engineering (36):
  • [10] Numerical simulation of deep foundation pit dewatering and optimization of controlling land subsidence
    Zhou, Nianqing
    Vermeer, Pieter A.
    Lou, Rongxiang
    Tang, Yiqun
    Jiang, Simin
    ENGINEERING GEOLOGY, 2010, 114 (3-4) : 251 - 260