Frequency-constrained multi-source power system scheduling against N-1 contingency and renewable uncertainty

被引:20
|
作者
Yin, Yue [1 ]
Liu, Tianqi [1 ]
Wu, Lei [2 ]
He, Chuan [1 ]
Liu, Yikui [2 ]
机构
[1] Sichuan Univ, Dept Elect Engn, Chengdu 610065, Peoples R China
[2] Stevens Inst Technol, Dept Elect & Comp Engn, Hoboken, NJ 07030 USA
关键词
Generalized benders composition; N-1; contingency; Primary frequency response; Transient frequency-constrained unit commitment; Uncertainty; DEMAND RESPONSE; UNIT COMMITMENT; ENERGY-STORAGE; WIND; CAPACITY; STRATEGIES; OPERATION;
D O I
10.1016/j.energy.2020.119296
中图分类号
O414.1 [热力学];
学科分类号
摘要
Security continues to be the most critical concern in power system operation, which is exceptionally important under low inertia and high uncertainty situations induced by an increasing penetration of renewable sources. This paper presents a transient frequency-constrained two-stage stochastic scheduling model to study the day-ahead operation of thermal-hydro-wind-demand response systems. Specifically, (i) limits on rate-of-change-of-frequency and maximum frequency derivation are introduced to provide sufficient governor reserve from multiple sources for guaranteeing dynamic frequency performance against N-1 contingency; (ii) The de-loaded mode of variable speed wind turbines is proposed for leveraging economics of system operation and security of dynamic frequency response; (iii) Virtual inertial constant of power systems with variable speed wind turbines is calculated to simulate performance of the virtual inertial control; (iv) Demand response is considered in the stochastic framework to mitigate the time delay of delivering virtual inertia. Multiple scenarios are generated via Monte Carlo method to simulate wind generation uncertainties. The proposed two-stage stochastic mixed-integer nonlinear programming model with binaries in both stages is solved via an improved generalized Benders decomposition, which takes about 40% less time than the standard generalized Benders decomposition. Several enhanced strategies are discussed to improve computational performance of the generalized Benders decomposition. Numerical simulations illustrate effectiveness of the proposed approach in coordinating multi-resource scheduling of power systems against N-1 contingencies and uncertainties with guaranteed frequency performance. Specifically, numerical results on the 6-bus system illustrate that: (i) The optimal wind generation penetration level of 40% could well balance the wind curtailments and the benefits of variable speed wind turbines for regulation provision; (ii) With 50% penetration of wind generation, doubling the capacity of demand response can reduce the amount of wind curtailment 50.42%, and decrease the transient frequency deviation to 0.25Hz. (C) 2020 Elsevier Ltd. All rights reserved.
引用
收藏
页数:14
相关论文
共 50 条
  • [31] Improved robust scheduling model for multi-source power system with wind power based on bad-scenario set
    Wu, Dongwen
    Yu, Aiqing
    Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2018, 39 (10): : 2929 - 2936
  • [32] Frequency stabilization of multi-area multi-source interconnected power system using TCSC and SMES mechanism
    Nandi, M.
    Shiva, C. K.
    Mukherjee, V.
    JOURNAL OF ENERGY STORAGE, 2017, 14 : 348 - 362
  • [33] A comparative performance analysis of frequency stabilization schemes for multi-area multi-source deregulated power system
    Kumar, Rajan
    Prasad, Lal Bahadur
    ENERGY SYSTEMS-OPTIMIZATION MODELING SIMULATION AND ECONOMIC ASPECTS, 2024, 15 (03): : 963 - 991
  • [34] Voltage Stability-based PMU Placement Considering N-1 Line Contingency and Power System Reliability
    Putranto, Lesnanto Multa
    Hara, Ryoichi
    Kita, Hiroyuki
    Tanaka, Eiichi
    2014 INTERNATIONAL CONFERENCE ON POWER ENGINEERING AND RENEWABLE ENERGY (ICPERE), 2014, : 120 - 125
  • [35] Load frequency control of area power system with multi-source power generation based on differential games theory
    Wu, L. (wuliang_hn@163.com), 1600, Chinese Society for Electrical Engineering (34):
  • [36] Discrete Data Load Frequency Control of Two-Area Power System with Multi-Source Power Generation
    Ramakrishna, K. S. S.
    Bhatti, T. S.
    INTERNATIONAL ENERGY JOURNAL, 2008, 9 (02): : 145 - 154
  • [37] Discrete data load frequency control of two-area power system with multi-source power generation
    Centre for Energy Studies, Indian Institute of Technology Delhi, Hauz Khas, New Delhi 110 016, India
    Int. Energy J., 2008, 2 (145-154):
  • [38] Modelling and control design of a multi-source renewable energy system with coupled DC/DC converters power compensation
    Djebbri S.
    Metatla A.
    Ladaci S.
    International Journal of Power and Energy Conversion, 2020, 11 (03) : 291 - 315
  • [39] Advanced Real-Time Power System Analytic Based on Thermal Security under N-1 Contingency
    Saadun, Nira
    Abdullah, Sheikh Kamar Sheikh
    Sarmin, Mohd Khairun Nizam Mohd
    Azmi, Muhamad Tarmizi
    Azha, Nur Nadia Nor Khairul
    Yusuf, Nik Sofizan Nik
    2019 IEEE INTERNATIONAL CONFERENCE ON AUTOMATIC CONTROL AND INTELLIGENT SYSTEMS (I2CACIS), 2019, : 216 - 220
  • [40] Transmission Security Enhancement under (N-1) Contingency Conditions with Optimal Unified Power Flow Controller and Renewable Energy Sources Generation
    Kavuturu, K. V. Kumar
    Narasimham, P. V. R. L.
    JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY, 2020, 15 (04) : 1617 - 1630