Investment planning for earthquake-resilient electric power systems considering cascading outages

被引:5
|
作者
Cheng, Boyu [1 ]
Nozick, Linda [1 ]
Dobson, Ian [2 ]
机构
[1] Cornell Univ, Sch Civil & Environm Engn, Ithaca, NY 14853 USA
[2] Iowa State Univ, Dept Elect & Comp Engn, Ames, IA USA
基金
美国国家科学基金会;
关键词
Power system; earthquake; optimization; restoration; algorithm; GROUND-MOTION PREDICTION; NETWORKS; STRATEGY; IMPACT;
D O I
10.1177/87552930221076870
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Earthquakes cause outages of power transmission system components due to direct physical damage and also through the initiation of cascading processes. This article explores what are the optimal capacity investments to increase the resilience of electric power transmission systems to earthquakes and how those investments change with respect to two issues: (1) the impact of including cascades in the investment optimization model and (2) the impact of focusing more heavily on the early stages of the outages after the earthquake in contrast to more evenly focusing on outages across the entire restoration process. A cascading outage model driven by the statistics of sample utility data is developed and used to locate the cascading lines. We compare the investment plans with and without the modeling of the cascades and with different levels of importance attached to outages that occur during different periods of the restoration process. Using a case study of the Eastern Interconnect transmission grid, where the seismic hazard stems mostly from the New Madrid Seismic Zone, we find that the cascades have little effect on the optimal set of capacity enhancement investments. However, the cascades do have a significant impact on the early stages of the restoration process. Also, the cascading lines can be far away from the initial physically damaged lines. More broadly, the early stages of the earthquake restoration process is affected by the extent of the cascading outages and is critical for search and rescue as well as restoring vital services. Also, we show that an investment plan focusing more heavily on outages in the first 3 days after the earthquake yields fewer outages in the first month, but more outages later in comparison with an investment plan focusing uniformly on outages over an entire 6-month restoration process.
引用
收藏
页码:1734 / 1760
页数:27
相关论文
共 50 条
  • [31] Defense Strategy for Resilient Shipboard Power Systems Considering Sequential Attacks
    Ding, Tao
    Qu, Ming
    Wu, Xiong
    Qin, Boyu
    Yang, Yongheng
    Blaabjerg, Frede
    IEEE TRANSACTIONS ON INFORMATION FORENSICS AND SECURITY, 2020, 15 : 3443 - 3453
  • [32] On Optimal Planning of Electric Power Generation Systems
    Aderinto, Y. O.
    Afolabi, A. O.
    Issa, I. T.
    PUNJAB UNIVERSITY JOURNAL OF MATHEMATICS, 2018, 50 (01): : 89 - 95
  • [33] Reliability planning for composite electric power systems
    Su, CT
    Lii, GR
    ELECTRIC POWER SYSTEMS RESEARCH, 1999, 51 (01) : 23 - 31
  • [34] Medium- and low-voltage planning of radial electric power distribution systems considering reliability
    Rupolo, Diogo
    Pereira, Benvindo Rodrigues, Jr.
    Contreras, Javier
    Sanches Mantovani, Jose Roberto
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2017, 11 (09) : 2212 - 2221
  • [35] Post-earthquake restoration planning for Los Angeles electric power
    Cagnan, Zehra
    Davidson, Rachel A.
    Guikema, Seth D.
    EARTHQUAKE SPECTRA, 2006, 22 (03) : 589 - 608
  • [36] Considering power quality in expansion planning of distribution systems
    Vuinovich, F
    Sannino, A
    Ippolito, MG
    Morana, G
    2004 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1 AND 2, 2004, : 674 - 679
  • [37] Optimal wind power generation investment, considering voltage stability of power systems
    Nikkhah, Saman
    Rabiee, Abbas
    RENEWABLE ENERGY, 2018, 115 : 308 - 325
  • [38] A Quantified Resilience Assessment Approach for Electrical Power Systems Considering Multiple Transmission Line Outages
    Liu, Xiaonan
    Hou, Kai
    Jia, Hongjie
    Mu, Yunfei
    Yu, Xiaodan
    Wang, Yue
    Dong, Jialin
    2017 IEEE ELECTRICAL POWER AND ENERGY CONFERENCE (EPEC), 2017, : 619 - 623
  • [39] Initial review of methods for cascading failure analysis in electric power transmission systems
    Baldick, Ross
    Chowdhury, Badrul
    Dobson, Ian
    Dong, Zhaoyang
    Gou, Bei
    Hawkins, David
    Huang, Henry
    Joung, Manho
    Kirschen, Daniel
    Li, Fangxing
    Li, Juan
    Li, Zuyi
    Liu, Chen-Ching
    Mili, Lamine
    Miller, Stephen
    Podmore, Robin
    Schneider, Kevin
    Sun, Kai
    Wang, David
    Wu, Zhigang
    Zhang, Pei
    Zhang, Wenjie
    Zhang, Xiaoping
    2008 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-11, 2008, : 52 - 59
  • [40] Optimization method of investment time series of power grid planning projects considering investment ability feedback
    Jin Z.
    Li H.
    Li S.
    Deng J.
    Yin S.
    Lu Y.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2022, 42 (03): : 168 - 174