Investment planning for earthquake-resilient electric power systems considering cascading outages

被引:5
|
作者
Cheng, Boyu [1 ]
Nozick, Linda [1 ]
Dobson, Ian [2 ]
机构
[1] Cornell Univ, Sch Civil & Environm Engn, Ithaca, NY 14853 USA
[2] Iowa State Univ, Dept Elect & Comp Engn, Ames, IA USA
基金
美国国家科学基金会;
关键词
Power system; earthquake; optimization; restoration; algorithm; GROUND-MOTION PREDICTION; NETWORKS; STRATEGY; IMPACT;
D O I
10.1177/87552930221076870
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Earthquakes cause outages of power transmission system components due to direct physical damage and also through the initiation of cascading processes. This article explores what are the optimal capacity investments to increase the resilience of electric power transmission systems to earthquakes and how those investments change with respect to two issues: (1) the impact of including cascades in the investment optimization model and (2) the impact of focusing more heavily on the early stages of the outages after the earthquake in contrast to more evenly focusing on outages across the entire restoration process. A cascading outage model driven by the statistics of sample utility data is developed and used to locate the cascading lines. We compare the investment plans with and without the modeling of the cascades and with different levels of importance attached to outages that occur during different periods of the restoration process. Using a case study of the Eastern Interconnect transmission grid, where the seismic hazard stems mostly from the New Madrid Seismic Zone, we find that the cascades have little effect on the optimal set of capacity enhancement investments. However, the cascades do have a significant impact on the early stages of the restoration process. Also, the cascading lines can be far away from the initial physically damaged lines. More broadly, the early stages of the earthquake restoration process is affected by the extent of the cascading outages and is critical for search and rescue as well as restoring vital services. Also, we show that an investment plan focusing more heavily on outages in the first 3 days after the earthquake yields fewer outages in the first month, but more outages later in comparison with an investment plan focusing uniformly on outages over an entire 6-month restoration process.
引用
收藏
页码:1734 / 1760
页数:27
相关论文
共 50 条
  • [21] Cascading Failure Analysis of CyberPhysical Power Systems Considering Routing Strategy
    Gao, Xingle
    Peng, Minfang
    Tse, Chi K.
    IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS II-EXPRESS BRIEFS, 2023, 70 (01) : 136 - 140
  • [22] Preventing cascading failure of electric power protection systems in nuclear power plant
    Moustafa, Abdelrahman Mohamed Mohamed Moustafa
    Chang, Choong-koo
    NUCLEAR ENGINEERING AND TECHNOLOGY, 2021, 53 (01) : 121 - 130
  • [23] Estimation for Expected Energy Not Served of Power Systems Using the Screening Methodology of Cascading Outages in South Korea
    Goo, Bokyung
    Hur, Jin
    ENERGIES, 2018, 11 (01):
  • [24] Transmission expansion planning in restructured power systems considering investment cost and n-1 reliability
    Islamic Azad University, Science and Research Branch and Gonabad Branch, Iran
    不详
    不详
    J. Appl. Sci., 2008, 23 (4312-4320):
  • [25] Resilient operational strategies for power systems considering the interactions with natural gas systems
    Sayed, Ahmed R.
    Wang, Cheng
    Bi, Tianshu
    APPLIED ENERGY, 2019, 241 : 548 - 566
  • [26] Guide to improved earthquake performance of electric power systems
    Schiff, Anshel J.
    Manuals and Reports on Engineering Practice, American Society of Civil Engineers, 1999, (96): : 1 - 328
  • [27] Temporal Difference-based Approach for Adaptive Cascading Outages Alleviation and Stability Improvement in Bulk Power Systems
    Zarrabian, Sina
    2017 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, 2017,
  • [28] Impact of Cascading and Common-Cause Outages on Resilience-Constrained Optimal Economic Operation of Power Systems
    Wang, Yifei
    Huang, Liping
    Shahidehpour, Mohammad
    Lai, Loi Lei
    Zhou, Ya
    IEEE TRANSACTIONS ON SMART GRID, 2020, 11 (01) : 590 - 601
  • [29] Nodal Reliability Evaluation of Interdependent Gas and Power Systems Considering Cascading Effects
    Bao, Minglei
    Ding, Yi
    Shao, Changzheng
    Yang, Yang
    Wang, Peng
    IEEE TRANSACTIONS ON SMART GRID, 2020, 11 (05) : 4090 - 4104
  • [30] Extending Traditional Planning Methods to Evaluate the Potential for Cascading Failures in Electric Power Grids
    Miller, Stephen S.
    2008 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-11, 2008, : 62 - 68