Investment planning for earthquake-resilient electric power systems considering cascading outages

被引:5
|
作者
Cheng, Boyu [1 ]
Nozick, Linda [1 ]
Dobson, Ian [2 ]
机构
[1] Cornell Univ, Sch Civil & Environm Engn, Ithaca, NY 14853 USA
[2] Iowa State Univ, Dept Elect & Comp Engn, Ames, IA USA
基金
美国国家科学基金会;
关键词
Power system; earthquake; optimization; restoration; algorithm; GROUND-MOTION PREDICTION; NETWORKS; STRATEGY; IMPACT;
D O I
10.1177/87552930221076870
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Earthquakes cause outages of power transmission system components due to direct physical damage and also through the initiation of cascading processes. This article explores what are the optimal capacity investments to increase the resilience of electric power transmission systems to earthquakes and how those investments change with respect to two issues: (1) the impact of including cascades in the investment optimization model and (2) the impact of focusing more heavily on the early stages of the outages after the earthquake in contrast to more evenly focusing on outages across the entire restoration process. A cascading outage model driven by the statistics of sample utility data is developed and used to locate the cascading lines. We compare the investment plans with and without the modeling of the cascades and with different levels of importance attached to outages that occur during different periods of the restoration process. Using a case study of the Eastern Interconnect transmission grid, where the seismic hazard stems mostly from the New Madrid Seismic Zone, we find that the cascades have little effect on the optimal set of capacity enhancement investments. However, the cascades do have a significant impact on the early stages of the restoration process. Also, the cascading lines can be far away from the initial physically damaged lines. More broadly, the early stages of the earthquake restoration process is affected by the extent of the cascading outages and is critical for search and rescue as well as restoring vital services. Also, we show that an investment plan focusing more heavily on outages in the first 3 days after the earthquake yields fewer outages in the first month, but more outages later in comparison with an investment plan focusing uniformly on outages over an entire 6-month restoration process.
引用
收藏
页码:1734 / 1760
页数:27
相关论文
共 50 条
  • [1] Pattern Analysis of Topological Attacks in Cyber-Physical Power Systems Considering Cascading Outages
    Zhang, Zhimei
    Huang, Shaowei
    Liu, Feng
    Mei, Shengwei
    IEEE ACCESS, 2020, 8 : 134257 - 134267
  • [2] Probabilistic security evaluation of bulk power system considering cascading outages
    Song Yunting
    He Hailei
    Zhang Dongxia
    Guo Jianbo
    2006 INTERNATIONAL CONFERENCE ON POWER SYSTEMS TECHNOLOGY: POWERCON, VOLS 1- 6, 2006, : 1364 - +
  • [3] Risk-Based Power System Security Analysis Considering Cascading Outages
    Jia, Youwei
    Xu, Zhao
    Lai, Loi Lei
    Wong, Kit Po
    IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2016, 12 (02) : 872 - 882
  • [4] Simulation of Cascading Outages Using a Power-Flow Model Considering Frequency
    Ju, Wenyun
    Sun, Kai
    Yao, Rui
    IEEE ACCESS, 2018, 6 : 37784 - 37795
  • [5] Blocking Control of Power System Cascading Failures Considering Line Outages Probability
    Gan G.
    Geng G.
    Gao B.
    Zhong W.
    Jiang Q.
    Huang D.
    Dianwang Jishu/Power System Technology, 2020, 44 (01): : 266 - 272
  • [6] Considering risk of cascading line outages in transmission expansion planning by benefit/cost analysis
    Karimi, Ebrahim
    Ebrahimi, Akbar
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2016, 78 : 480 - 488
  • [7] Investment Planning for Electric Power Systems Under Terrorist Threat
    Romero, Natalia
    Xu, Ningxiong
    Nozick, Linda K.
    Dobson, Ian
    Jones, Dean
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (01) : 108 - 116
  • [8] Identification of critical outages leading to cascading failures in electrical power systems
    Genesi, C.
    Granelli, G.
    Innorta, M.
    Marannino, P.
    Montagna, M.
    Zanellini, F.
    2007 IEEE LAUSANNE POWERTECH, VOLS 1-5, 2007, : 57 - +
  • [9] Seismic performance of earthquake-resilient beam-to-column connection considering friction-slip mechanism
    Liu, Ruyue
    Wu, Jianbin
    Yan, Guiyun
    Lai, Qiulan
    Wang, Hao
    JOURNAL OF BUILDING ENGINEERING, 2023, 75
  • [10] Quantifying cascading power outages during climate extremes considering renewable energy integration
    Xu, Luo
    Lin, Ning
    Poor, H. Vincent
    Xi, Dazhi
    Perera, A. T. D.
    NATURE COMMUNICATIONS, 2025, 16 (01)