Economic operation of a wind-solar-hydro complementary system considering risks of output shortage, power curtailment and spilled water

被引:98
|
作者
Huang, Kangdi [1 ,2 ]
Liu, Pan [1 ,2 ]
Ming, Bo [3 ]
Kim, Jong-Suk [1 ,2 ]
Gong, Yu [1 ,2 ]
机构
[1] Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S, Wuhan 430072, Peoples R China
[2] Wuhan Univ, Hubei Prov Key Lab Water Syst Sci Sponge City Con, Wuhan 430072, Peoples R China
[3] Xian Univ Technol, State Key Lab Ecohydraul Northwest Arid Reg China, Xian 710048, Peoples R China
基金
中国国家自然科学基金;
关键词
Wind-solar-hydro complementary system; Risk; Two-layer nested approach; Economic operation; Forecast scenarios; SCALE PHOTOVOLTAIC POWER; ENERGY CURTAILMENT; UNIT COMMITMENT; STORAGE; OPTIMIZATION; PREDICTION;
D O I
10.1016/j.apenergy.2021.116805
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Integrated operation of hydropower, wind and photovoltaic (PV) power, which exploits the regulation flexibility of hydropower to complement the uncertainty of wind and PV power outputs, is a promising way to enhance resource utilization efficiency. However, the short-term economic operation of the wind-solar-hydro complementary system (WSHCS) has risks such as output shortage, power curtailment and spilled water. To address this issue, we propose three risk indicators to quantify them and then optimize the WSHCS. To begin with, the uncertainties of WSHCS are described, and varied forecast scenarios are produced by the copula method. Then, the three risks of WSHCS, which are quantified based on the output errors of wind-solar and regulation ability of hydropower station, are used as objective functions of the optimization model. Finally, a two-layer nested approach is used to optimize online units of hydropower station for minimizing the risks of WSHCS and water consumption of hydropower station. The Guandi wind-solar-hydro hybrid power plant on China's Yalong River is selected as a case study. Results from the case study show that the output shortage of WSHCS mainly occurs in the two time periods: 1) when the upper limit of regulation ability of the hydropower station is small, and 2) when the output of wind or PV power is large. The probability of output shortage during WSHCS operation is reduced from 100% to 0%, and the probability of spilled water can be reduced by 46.7%similar to 73.9%, without power curtailment. Thus, this study provides the technical support for safe and economic operation of renewable energy.
引用
收藏
页数:13
相关论文
共 50 条
  • [41] Economic Enhancement of Wind-Thermal-Hydro System Considering Imbalance Cost in Deregulated Power Market
    Basu, Jayanta Bhusan
    Dawn, Subhojit
    Saha, Pradip Kumar
    Chakraborty, Mitul Ranjan
    Ustun, Taha Selim
    SUSTAINABILITY, 2022, 14 (23)
  • [42] Economic operation strategy of hydrogen integrated energy system considering uncertainty of photovoltaic output power
    Han Z.
    Li Z.
    Zhang W.
    Liu K.
    Dong H.
    Yuan T.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2021, 41 (10): : 99 - 106
  • [43] Economic operation strategy of integrated hydrogen energy system considering the uncertainty of PV power output
    Lu, Zhenjun
    Zhu, Qing
    Zhang, Weiguo
    Lin, Huijie
    ENERGY REPORTS, 2023, 9 : 463 - 471
  • [44] Economic operation strategy of integrated hydrogen energy system considering the uncertainty of PV power output
    Lu, Zhenjun
    Zhu, Qing
    Zhang, Weiguo
    Lin, Huijie
    ENERGY REPORTS, 2023, 9 : 463 - 471
  • [45] Economic operation strategy of integrated hydrogen energy system considering the uncertainty of PV power output
    Lu, Zhenjun
    Zhu, Qing
    Zhang, Weiguo
    Lin, Huijie
    ENERGY REPORTS, 2023, 9 : 463 - 471
  • [46] Short-term stochastic multi-objective optimization scheduling of wind-solar-hydro hybrid system considering source-load uncertainties
    Fan, Yukun
    Liu, Weifeng
    Zhu, Feilin
    Wang, Sen
    Yue, Hao
    Zeng, Yurou
    Xu, Bin
    Zhong, Ping-an
    APPLIED ENERGY, 2024, 372
  • [47] Modeling of economic dispatch of power system considering joint effect of wind power, solar energy and load
    Miao, S. (shmiao@hust.edu.cn), 1600, Chinese Society for Electrical Engineering (34):
  • [48] Study on the economic dispatch strategy of power system with combined operation of concentrated solar power and wind farm
    Song W.
    Lü J.
    Zhao L.
    Tuo J.
    Wang X.
    Zhao, Lingxia (zhaolingxia@163.com), 1600, Power System Protection and Control Press (48): : 95 - 102
  • [49] Operational economic evaluation of hydro-wind-photovoltaic power generation system considering the vibration avoidance strategy
    Chen D.
    Zhang M.
    Liu Y.
    Zhao P.
    Zhao Z.
    He M.
    Shuili Xuebao/Journal of Hydraulic Engineering, 2024, 55 (04): : 403 - 415
  • [50] A short-term optimal scheduling model for wind-solar-hydro hybrid generation system with cascade hydropower considering regulation reserve and spinning reserve requirements
    Xie, Jun
    Zheng, Yimin
    Pan, Xueping
    Zheng, Yuan
    Zhang, Liqin
    Zhan, Yongsheng
    Xie, Jun (jxie@hhu.edu.cn), 1600, Institute of Electrical and Electronics Engineers Inc. (09): : 10765 - 10777