Economic operation of a wind-solar-hydro complementary system considering risks of output shortage, power curtailment and spilled water

被引:98
|
作者
Huang, Kangdi [1 ,2 ]
Liu, Pan [1 ,2 ]
Ming, Bo [3 ]
Kim, Jong-Suk [1 ,2 ]
Gong, Yu [1 ,2 ]
机构
[1] Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S, Wuhan 430072, Peoples R China
[2] Wuhan Univ, Hubei Prov Key Lab Water Syst Sci Sponge City Con, Wuhan 430072, Peoples R China
[3] Xian Univ Technol, State Key Lab Ecohydraul Northwest Arid Reg China, Xian 710048, Peoples R China
基金
中国国家自然科学基金;
关键词
Wind-solar-hydro complementary system; Risk; Two-layer nested approach; Economic operation; Forecast scenarios; SCALE PHOTOVOLTAIC POWER; ENERGY CURTAILMENT; UNIT COMMITMENT; STORAGE; OPTIMIZATION; PREDICTION;
D O I
10.1016/j.apenergy.2021.116805
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Integrated operation of hydropower, wind and photovoltaic (PV) power, which exploits the regulation flexibility of hydropower to complement the uncertainty of wind and PV power outputs, is a promising way to enhance resource utilization efficiency. However, the short-term economic operation of the wind-solar-hydro complementary system (WSHCS) has risks such as output shortage, power curtailment and spilled water. To address this issue, we propose three risk indicators to quantify them and then optimize the WSHCS. To begin with, the uncertainties of WSHCS are described, and varied forecast scenarios are produced by the copula method. Then, the three risks of WSHCS, which are quantified based on the output errors of wind-solar and regulation ability of hydropower station, are used as objective functions of the optimization model. Finally, a two-layer nested approach is used to optimize online units of hydropower station for minimizing the risks of WSHCS and water consumption of hydropower station. The Guandi wind-solar-hydro hybrid power plant on China's Yalong River is selected as a case study. Results from the case study show that the output shortage of WSHCS mainly occurs in the two time periods: 1) when the upper limit of regulation ability of the hydropower station is small, and 2) when the output of wind or PV power is large. The probability of output shortage during WSHCS operation is reduced from 100% to 0%, and the probability of spilled water can be reduced by 46.7%similar to 73.9%, without power curtailment. Thus, this study provides the technical support for safe and economic operation of renewable energy.
引用
收藏
页数:13
相关论文
共 50 条
  • [21] Research on Multiobjective Optimal Operation Strategy for Wind-Photovoltaic-Hydro Complementary Power System
    Zhao, Guo
    Wan, Chenxi
    Zuo, Wanqing
    Zhang, Kefei
    Shu, Xinyi
    International Journal of Photoenergy, 2022, 2022
  • [22] Peak shaving and short-term economic operation of hydro-wind-PV hybrid system considering the uncertainty of wind and PV power
    Lei, Kaixuan
    Chang, Jianxia
    Wang, Xuebin
    Guo, Aijun
    Wang, Yimin
    Ren, Chengqing
    RENEWABLE ENERGY, 2023, 215
  • [23] Research on Operation Strategy of Wind-Solar-Hydro Power Generation System Based on Pre-day and Real-Time Two Stage Joint Optimization Model
    Tang, Fan
    Hu, Wei
    Zhang, Xin
    Zhang, Yudong
    Liang, Xiaobin
    Sun, Yunchao
    2022 IEEE/IAS INDUSTRIAL AND COMMERCIAL POWER SYSTEM ASIA (I&CPS ASIA 2022), 2022, : 1145 - 1149
  • [24] Environmental and economic dispatching strategy for power system with the complementary combination of wind-solar-hydro-thermal-storage multiple sources
    Li, Xianwei
    Wang, Kun
    Xu, Minxing
    Fu, Meiping
    Miao, Shihong
    FRONTIERS IN ENERGY RESEARCH, 2024, 12
  • [25] Strategy of Wind Curtailment Accommodation in Heating Season by Considering Joint Operation of Concentrated Solar Power Plant and Electric Boiler
    Cui Y.
    Zhang J.
    Wang Z.
    Wang M.
    Zhao Y.
    Gaodianya Jishu/High Voltage Engineering, 2021, 47 (06): : 2250 - 2258
  • [26] Optimal power flow for an integrated wind-solar-hydro-thermal power system considering uncertainty of wind speed and solar radiation
    Ly Huu Pham
    Bach Hoang Dinh
    Thang Trung Nguyen
    NEURAL COMPUTING & APPLICATIONS, 2022, 34 (13): : 10655 - 10689
  • [27] Power system economic dispatch considering penalty cost of wind farm output
    Dong, Xiaotian
    Yan, Zheng
    Feng, Donghan
    Guo, Jun
    Hu, Diangang
    Xia, Tian
    Yang, Yanhui
    Dianwang Jishu/Power System Technology, 2012, 36 (08): : 76 - 80
  • [28] Optimal power flow for an integrated wind-solar-hydro-thermal power system considering uncertainty of wind speed and solar radiation
    Ly Huu Pham
    Bach Hoang Dinh
    Thang Trung Nguyen
    Neural Computing and Applications, 2022, 34 : 10655 - 10689
  • [29] Locational Marginal Pricing and Daily Operation Scheduling of a Hydro-Thermal-Wind-Photovoltaic Power System Using BESS to Reduce Wind Power Curtailment
    Menezes, Roberto Felipe Andrade
    Soriano, Guilherme Delgado
    de Aquino, Ronaldo Ribeiro Barbosa
    ENERGIES, 2021, 14 (05)
  • [30] The role of wind power and solar PV in reducing risks in the Brazilian hydro-thermal power system
    Schmidt, Johannes
    Cancella, Rafael
    Pereira, Amaro O., Jr.
    ENERGY, 2016, 115 : 1748 - 1757