Analysis, design, and control of Bernoulli production lines with waiting time constraints

被引:22
|
作者
Lee, Jun-Ho [1 ]
Zhao, Cong [2 ]
Li, Jingshan [2 ]
Papadopoulos, Chrissoleon T. [3 ]
机构
[1] Konkuk Univ, Sch Business, Seoul 05029, South Korea
[2] Univ Wisconsin, Dept Ind & Syst Engn, Madison, WI 53706 USA
[3] Nazarbayev Univ, Master Engn Management Program, Sch Engn, Astana 010000, Kazakhstan
关键词
Time constraint; Yield analysis; Bernoulli machine; Optimal buffer design; Production control; AUTOMATIC TRANSFER LINES; SERIAL PRODUCTION LINES; CLUSTER TOOLS; PERFORMANCE EVALUATION; MANUFACTURING SYSTEMS; 2-MACHINE FLOWSHOP; INVENTORY SYSTEMS; BUFFER CAPACITY; PETRI-NET; ALLOCATION;
D O I
10.1016/j.jmsy.2018.01.001
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Waiting time constraints between two processes are one of common scheduling requirements in many production systems, such as semiconductor, automotive, food, and battery manufacturing. When the time constraints are introduced, quality inspection should be carried out on parts that have exceeded a given time limit and such parts are subject to be re-processed or scrapped, which incurs additional expenses and efforts. Therefore, the foremost goal is to maximize yield, which is defined by the production rate of parts that do not violate the time constraints. In this paper, we present a mathematical model of Bernoulli production lines to evaluate yield and examine its properties with respect to time constraints, buffer capacity, and machine reliability. System properties such as monotonicity and asymptotic characteristics are analyzed. With the analysis results, an efficient algorithm to design an optimal buffer capacity is developed. It is shown that, in contrast to traditional production lines, there is no monotonicity of yield on the reliability of an upstream machine; that is, an upstream machine becoming more reliable does not always contribute to increasing yield. Therefore, optimal control policies are presented to control the upstream machine for maximal yield. Finally, a case study is introduced to illustrate the applicability of the method. (C) 2018 Published by Elsevier Ltd on behalf of The Society of Manufacturing Engineers.
引用
收藏
页码:208 / 220
页数:13
相关论文
共 50 条
  • [41] Operations Sequencing in Flexible Production Lines With Bernoulli Machines
    Zhang, Liang
    Yue, Xiaohang
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2011, 8 (03) : 645 - 653
  • [42] ANALYSIS OF PRIORITY ACCESS METHODS TO A LOCAL AREA NETWORK WITH WAITING TIME CONSTRAINTS
    BOGUSLAVSKII, LB
    PODLAZOV, VS
    STOLYAR, AL
    AUTOMATION AND REMOTE CONTROL, 1989, 50 (10) : 1449 - 1457
  • [43] Analysis of closed-loop production lines with Bernoulli reliability machines: Theory and application
    Feng, Yuan
    Zhong, Xiang
    Li, Jingshan
    Fan, Wenhui
    IISE TRANSACTIONS, 2018, 50 (03) : 143 - 160
  • [44] Transient Response of Homogenous and Nonhomogenous Bernoulli Production Lines
    Hadzic, Neven
    Lozar, Viktor
    Opetuk, Tihomir
    Keser, Robert
    MATHEMATICS, 2023, 11 (24)
  • [45] Dynamic Bottleneck in Serial Production Lines with Bernoulli Machines
    Tu, Jiachen
    Bai, Yishu
    Yang, Mengzhuo
    Zhang, Liang
    Denno, Peter
    2019 IEEE 15TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2019, : 79 - 84
  • [46] Transient Performance Analysis of Closed Production Lines With Bernoulli Machines, Finite Buffers, and Carriers
    Jia, Zhiyang
    Zhang, Liang
    IEEE ROBOTICS AND AUTOMATION LETTERS, 2017, 2 (04): : 1893 - 1900
  • [47] A Family of Waiting time Distributions Arising from a Bivariate Bernoulli Scheme
    Barakat, H. M.
    INDIAN JOURNAL OF PURE & APPLIED MATHEMATICS, 2019, 50 (01): : 213 - 224
  • [48] A Family of Waiting time Distributions Arising from a Bivariate Bernoulli Scheme
    H. M. Barakat
    Indian Journal of Pure and Applied Mathematics, 2019, 50 : 213 - 224
  • [49] AVERAGE WAITING TIME OF A SYMMETRICAL POLLING SYSTEM UNDER BERNOULLI SCHEDULING
    TAKINE, T
    HASEGAWA, T
    OPERATIONS RESEARCH LETTERS, 1991, 10 (09) : 535 - 539
  • [50] Design and Control of Agile Automated CONWIP Production Lines
    Hopp, Wallace J.
    Iravani, Seyed M. R.
    Shou, Biying
    Lien, Robert
    NAVAL RESEARCH LOGISTICS, 2009, 56 (01) : 42 - 56