Analysis, design, and control of Bernoulli production lines with waiting time constraints

被引:22
|
作者
Lee, Jun-Ho [1 ]
Zhao, Cong [2 ]
Li, Jingshan [2 ]
Papadopoulos, Chrissoleon T. [3 ]
机构
[1] Konkuk Univ, Sch Business, Seoul 05029, South Korea
[2] Univ Wisconsin, Dept Ind & Syst Engn, Madison, WI 53706 USA
[3] Nazarbayev Univ, Master Engn Management Program, Sch Engn, Astana 010000, Kazakhstan
关键词
Time constraint; Yield analysis; Bernoulli machine; Optimal buffer design; Production control; AUTOMATIC TRANSFER LINES; SERIAL PRODUCTION LINES; CLUSTER TOOLS; PERFORMANCE EVALUATION; MANUFACTURING SYSTEMS; 2-MACHINE FLOWSHOP; INVENTORY SYSTEMS; BUFFER CAPACITY; PETRI-NET; ALLOCATION;
D O I
10.1016/j.jmsy.2018.01.001
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Waiting time constraints between two processes are one of common scheduling requirements in many production systems, such as semiconductor, automotive, food, and battery manufacturing. When the time constraints are introduced, quality inspection should be carried out on parts that have exceeded a given time limit and such parts are subject to be re-processed or scrapped, which incurs additional expenses and efforts. Therefore, the foremost goal is to maximize yield, which is defined by the production rate of parts that do not violate the time constraints. In this paper, we present a mathematical model of Bernoulli production lines to evaluate yield and examine its properties with respect to time constraints, buffer capacity, and machine reliability. System properties such as monotonicity and asymptotic characteristics are analyzed. With the analysis results, an efficient algorithm to design an optimal buffer capacity is developed. It is shown that, in contrast to traditional production lines, there is no monotonicity of yield on the reliability of an upstream machine; that is, an upstream machine becoming more reliable does not always contribute to increasing yield. Therefore, optimal control policies are presented to control the upstream machine for maximal yield. Finally, a case study is introduced to illustrate the applicability of the method. (C) 2018 Published by Elsevier Ltd on behalf of The Society of Manufacturing Engineers.
引用
收藏
页码:208 / 220
页数:13
相关论文
共 50 条
  • [21] Closed Bernoulli lines with finite buffers: real-time performance analysis, completion time bottleneck and carrier control
    Jia, Zhiyang
    Dai, Yaping
    Chen, Jingchuan
    INTERNATIONAL JOURNAL OF CONTROL, 2021, 94 (07) : 1994 - 2007
  • [22] An Improved Aggregation Method for Performance Analysis of Bernoulli Serial Production Lines
    Yan, Fei-Yi
    Wang, Jun-Qiang
    Li, Yang
    Cui, Peng-Hao
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2021, 18 (01) : 114 - 121
  • [23] Energy-efficient on/off control in serial production lines with Bernoulli machines
    Wang, Xiaohan
    Dai, Yaping
    Jia, Zhiyang
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2024, 36 (01) : 103 - 128
  • [24] Energy-efficient on/off control in serial production lines with Bernoulli machines
    Xiaohan Wang
    Yaping Dai
    Zhiyang Jia
    Flexible Services and Manufacturing Journal, 2024, 36 : 103 - 128
  • [25] Performance analysis and optimisation of Bernoulli serial production lines with dynamic real-time bottleneck identification and mitigation
    Tu, Jiachen
    Zhang, Liang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2022, 60 (13) : 3989 - 4005
  • [26] Pipeline design with flow assurance constraints in offshore production lines
    Thamires A. L. Guedes
    Argimiro R. Secchi
    Príamo A. Melo
    Rodrigo G. D. Teixeira
    Brazilian Journal of Chemical Engineering, 2020, 37 : 555 - 568
  • [27] Pipeline design with flow assurance constraints in offshore production lines
    Guedes, Thamires A. L.
    Secchi, Argimiro R.
    Melo, Priamo A.
    Teixeira, Rodrigo G. D.
    BRAZILIAN JOURNAL OF CHEMICAL ENGINEERING, 2020, 37 (03) : 555 - 568
  • [28] Production Control in Semiconductor manufacturing with Time Constraints
    Sadeghi, Rezvan
    Dauzere-Peres, Stephane
    Yugma, Claude
    Lepelletier, Guillaume
    2015 26TH ANNUAL SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE (ASMC), 2015, : 29 - 33
  • [29] On waiting time distribution of runs of ones or zeros in a Bernoulli sequence
    Kim, Sungsu
    Park, Chongjin
    Oh, Jungtaek
    STATISTICS & PROBABILITY LETTERS, 2013, 83 (01) : 339 - 344
  • [30] SOONER AND LATER WAITING TIME PROBLEMS FOR MARKOVIAN BERNOULLI TRIALS
    BALASUBRAMANIAN, K
    VIVEROS, R
    BALAKRISHNAN, N
    STATISTICS & PROBABILITY LETTERS, 1993, 18 (02) : 153 - 161