The study of train operation plan of night train on Beijing-Guangzhou high-speed railway under segmented rectangular maintenance time window

被引:1
|
作者
Jia, Hao [1 ]
Han, Baoming [1 ]
Zhang, Qi [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Traffle & Transportat, Beijing 100044, Peoples R China
来源
关键词
Beijing-Guangzhou high-speed railway; night train; segmented rectangular maintenance time window; train operation plan;
D O I
10.4028/www.scientific.net/AMM.505-506.619
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Considering the demand of night train on Beijing-Guangzhou high-speed railway, two modes of segmented rectangular maintenance time window are discussed. Methods to make train operation plans under these two modes are proposed, aiming at shortening the train waiting time and making the departure and arrival time more reasonable. Comparing the new designed train operation plans with the original one under the vertical rectangular maintenance time window, it shows that segmented rectangular maintenance time window is better in night train operation.
引用
收藏
页码:619 / 623
页数:5
相关论文
共 50 条
  • [31] Integrated optimization on train timetabling and maintenance time for the operation day of high-speed sleeper trains
    Yuan, Bo
    Li, Haiying
    Liao, Zhengwen
    Journal of Railway Science and Engineering, 2024, 21 (04): : 1309 - 1319
  • [32] Interaction analysis between night train operation and maintenance time on passenger dedicated railway line
    Nie, Lei
    Hu, Bisong
    Fu, Huiling
    Tong, Lu
    Journal of Transportation Systems Engineering and Information Technology, 2010, 10 (05) : 66 - 72
  • [33] Study on Speed Controller of Automatic Train Operation for High-speed Train Based on Grey Genetic Algorithm
    Gao, Fan
    Wang, Fuzhang
    Wu, Yanhua
    Cai, Xiaolei
    Li, Xinqin
    Yu, Zhe
    2018 ASIA-PACIFIC CONFERENCE ON INTELLIGENT MEDICAL (APCIM) / 2018 7TH INTERNATIONAL CONFERENCE ON TRANSPORTATION AND TRAFFIC ENGINEERING (ICTTE 2018), 2018, : 27 - 31
  • [34] Two-stage Heuristic Algorithm for Dynamic Train Operation Plan of High-speed Express Freight Train
    Jiang, Lingming
    Shen, Zexi
    Liu, Rongyao
    Wang, Xinyi
    Pan, Jinshan
    Pu, Fangzhu
    Journal of Network Intelligence, 2024, 9 (01): : 551 - 570
  • [35] A Train Rescheduling Optimization model with considering the Train Control for A High-Speed Railway Line under Temporary Speed Restriction
    Long, Sihui
    Meng, Lingyun
    Wang, Yihui
    Miao, Jianrui
    Li, Tinglan
    Corman, Francesco
    2019 IEEE INTELLIGENT TRANSPORTATION SYSTEMS CONFERENCE (ITSC), 2019, : 2809 - 2816
  • [36] Study on the mechanism of high-speed train following operation control
    Pan, Deng
    Zheng, Ying-Ping
    Tiedao Xuebao/Journal of the China Railway Society, 2013, 35 (03): : 53 - 61
  • [37] Research on the stopping plan design of high-speed railway train based on EMU connection
    Qin, Yongsheng
    Meng, Xuelei
    Shen, Facai
    Zhang, Fengting
    Liu, Renhua
    Journal of Railway Science and Engineering, 2021, 18 (09) : 2271 - 2279
  • [38] Robust Optimization of High-Speed Railway Train Plan Based on Multiple Demand Scenarios
    Zhou, Wenliang
    Kang, Jing
    Qin, Jin
    Li, Sha
    Huang, Yu
    MATHEMATICS, 2022, 10 (08)
  • [39] Evaluation and adjustment of high-speed railway train line plan based on economic benefits
    Yang, Min
    Li, Ran
    Ni, Shaoquan
    Journal of Railway Science and Engineering, 2021, 18 (11) : 2824 - 2832
  • [40] Notch-based speed trajectory optimisation for high-speed railway automatic train operation
    Feng, Minling
    Wu, Chaoxian
    Lu, Shaofeng
    Wang, Yihui
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2022, 236 (02) : 159 - 171