The study of train operation plan of night train on Beijing-Guangzhou high-speed railway under segmented rectangular maintenance time window

被引:1
|
作者
Jia, Hao [1 ]
Han, Baoming [1 ]
Zhang, Qi [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Traffle & Transportat, Beijing 100044, Peoples R China
来源
关键词
Beijing-Guangzhou high-speed railway; night train; segmented rectangular maintenance time window; train operation plan;
D O I
10.4028/www.scientific.net/AMM.505-506.619
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Considering the demand of night train on Beijing-Guangzhou high-speed railway, two modes of segmented rectangular maintenance time window are discussed. Methods to make train operation plans under these two modes are proposed, aiming at shortening the train waiting time and making the departure and arrival time more reasonable. Comparing the new designed train operation plans with the original one under the vertical rectangular maintenance time window, it shows that segmented rectangular maintenance time window is better in night train operation.
引用
收藏
页码:619 / 623
页数:5
相关论文
共 50 条
  • [21] Capacity-Oriented Train Scheduling of High-Speed Railway Considering the Operation and Maintenance of Rolling Stock
    Zhou, Wenliang
    Li, Sha
    Kang, Jing
    Huang, Yu
    MATHEMATICS, 2022, 10 (10)
  • [22] An Automatic Train Operation Based Real-Time Rescheduling Model for High-Speed Railway
    Liu, Fan
    Xun, Jing
    MATHEMATICS, 2023, 11 (21)
  • [23] Random Field Modeling of Track Irregularity of Beijing-Guangzhou High-Speed Railway with Karhunen-Loeve Expansion
    Zhu, Mengyi
    Cheng, Xiaohui
    Miao, Lixin
    Sun, Xinya
    INTERNATIONAL JOURNAL OF DISTRIBUTED SENSOR NETWORKS, 2015,
  • [24] Collaborative Optimization for Overnight Train Service Plan of High-speed Railway Express
    Gao, Ruhu
    Wang, Qianyu
    Niu, Huimin
    Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2024, 24 (06): : 254 - 264
  • [25] Optimization Method for Train Connection Plan in Timetable of High-Speed Railway Network
    Fu H.
    Liu X.
    Hu H.
    Nie B.
    Zhang K.
    Zhongguo Tiedao Kexue/China Railway Science, 2024, 45 (03): : 149 - 158
  • [26] Analysis on aerodynamic characteristics and noise of the high-speed train under high-speed operation
    Yue, Meng-tian
    Li, Hong
    Zhou, Xin
    JOURNAL OF VIBROENGINEERING, 2015, 17 (03) : 1452 - 1463
  • [27] The Security Study of Train Derailment on High-Speed Railway Bridge
    Lin, Yusen
    Xin, Li Hua
    TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 1144 - 1147
  • [28] Integrated Overnight Train Scheduling and Maintenance Planning for High-Speed Railway Lines
    Wang, Dian
    Zhan, Shuguang
    Peng, Qiyuan
    Zhou, Wentao
    TRANSPORTATION RESEARCH RECORD, 2021, 2675 (03) : 222 - 237
  • [29] Integrated optimization of train scheduling and maintenance planning on high-speed railway corridors
    Zhang, Chuntian
    Gao, Yuan
    Yang, Lixing
    Kumar, Uday
    Gao, Ziyou
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2019, 87 : 86 - 104
  • [30] Optimal Design of Train Operation Mode of High-speed Railway Cyclic Timetable
    Li H.
    Nie L.
    Fu H.
    Tiedao Xuebao/Journal of the China Railway Society, 2023, 45 (08): : 18 - 26