The study of train operation plan of night train on Beijing-Guangzhou high-speed railway under segmented rectangular maintenance time window

被引:1
|
作者
Jia, Hao [1 ]
Han, Baoming [1 ]
Zhang, Qi [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Traffle & Transportat, Beijing 100044, Peoples R China
来源
关键词
Beijing-Guangzhou high-speed railway; night train; segmented rectangular maintenance time window; train operation plan;
D O I
10.4028/www.scientific.net/AMM.505-506.619
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Considering the demand of night train on Beijing-Guangzhou high-speed railway, two modes of segmented rectangular maintenance time window are discussed. Methods to make train operation plans under these two modes are proposed, aiming at shortening the train waiting time and making the departure and arrival time more reasonable. Comparing the new designed train operation plans with the original one under the vertical rectangular maintenance time window, it shows that segmented rectangular maintenance time window is better in night train operation.
引用
收藏
页码:619 / 623
页数:5
相关论文
共 50 条
  • [1] Train Operation Plan Research of Guangzhou-Shenzhen(HK) High-speed Railway
    Shi Hongguo
    Guo Hanying
    2011 INTERNATIONAL CONFERENCE ON ECONOMIC, EDUCATION AND MANAGEMENT (ICEEM2011), VOL III, 2011, : 384 - 387
  • [2] Benefit Analysis of Wuhan-Guangzhou High-Speed Railway Train Operation Plan
    Gu, Xuefei
    Yan, Haifeng
    Tan, Xue
    PROCEEDINGS OF THE SIXTH INTERNATIONAL CONFERENCE ON TRANSPORTATION ENGINEERING (ICTE 2019), 2019, : 625 - 631
  • [3] Maintenance of the high-speed train fleet in operation
    Andrieu, Claude
    Revue Generale des Chemins de Fer, 2002, (MAR.): : 135 - 139
  • [4] The Economic Effect of High-Speed Railway in Beijing-Guangzhou Railway: A Difference-in-Differences Estimation
    Peng, Xue
    2016 ICMIBI INTERNATIONAL CONFERENCE ON HUMANITY, EDUCATION AND SOCIAL SCIENCE (ICMIBI-HESS 2016), 2016, 62 : 162 - 167
  • [5] Scheduling Method for Integrated Plan of Train Operation and Shunting Operation in High-speed Railway Station
    Zhong M.-X.
    Yue Y.-X.
    Zhou L.-S.
    Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2021, 21 (03): : 176 - 186
  • [6] Optimizing a High-Speed Railway Operation Plan Based on Train Capacity and Service Frequency
    Wang, Qing
    Deng, Lianbo
    Chen, Yuxin
    Zhou, Wenliang
    Niu, Feng
    JOURNAL OF TRANSPORTATION ENGINEERING PART A-SYSTEMS, 2020, 146 (10)
  • [7] Survey on high-speed railway train plan design issues
    Zhou, Pengfei
    Han, Baoming
    Zhang, Qi
    ADVANCES IN TRANSPORTATION, PTS 1 AND 2, 2014, 505-506 : 489 - 492
  • [8] Collaborative Optimization for Overnight Train Operation and Maintenance Window Setting of High-Speed Railways
    Xu C.
    Li S.
    Li S.
    Ni S.
    Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2021, 56 (04): : 744 - 751
  • [9] Train Stop Schedule Plan Optimization of High-Speed Railway Based on Time-Segmented Passenger Flow Demand
    Xu, Ruihua
    Wang, Fangsheng
    Zhou, Feng
    PROCEEDINGS OF THE SIXTH INTERNATIONAL CONFERENCE ON TRANSPORTATION ENGINEERING (ICTE 2019), 2019, : 899 - 906
  • [10] Prediction methods of train operation conflict for high-speed railway
    Wen C.
    Journal of Transportation Security, 2010, 3 (4) : 275 - 286