Solving a large-scale precedence constrained scheduling problem with elastic jobs using tabu search

被引:6
|
作者
Pedersen, Christian R.
Rasmussen, Rasmus V.
Andersen, Kim A.
机构
[1] Aarhus Univ, Dept Operat Res, DK-8000 Aarhus C, Denmark
[2] Aarhus Sch Business, Dept Accounting Finance & Logist, DK-8210 Aarhus V, Denmark
关键词
large-scale scheduling; elastic jobs; precedence constraints; practical application; tabu search; ALGORITHM; MAKESPAN;
D O I
10.1016/j.cor.2005.08.001
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper presents a solution method for minimizing makespan of a practical large-scale scheduling problem with elastic jobs. The jobs are processed on three servers and restricted by precedence constraints, time windows and capacity limitations. We derive a new method for approximating the server exploitation of the elastic jobs and solve the problem using a tabu search procedure. Finding an initial feasible solution is in general NP-complete, but the tabu search procedure includes a specialized heuristic for solving this problem. The solution method has proven to be very efficient and leads to a significant decrease in makespan compared to the strategy currently implemented. (c) 2005 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2025 / 2042
页数:18
相关论文
共 50 条
  • [31] Large-scale timetabling problems with adaptive tabu search
    Awad, Fouad H.
    Al-kubaisi, Ali
    Mahmood, Maha
    JOURNAL OF INTELLIGENT SYSTEMS, 2022, 31 (01) : 168 - 176
  • [32] A kernel route tabu search algorithm for large-scale integrated vehicle routing problem
    Zhong, Shiquan
    Wang, Xuelian
    PACIIA: 2008 PACIFIC-ASIA WORKSHOP ON COMPUTATIONAL INTELLIGENCE AND INDUSTRIAL APPLICATION, VOLS 1-3, PROCEEDINGS, 2008, : 1583 - +
  • [33] Critical-edge based tabu search algorithm for solving large-scale multi-vehicle Chinese postman problem
    Tang, Jizhou
    He, Lili
    Cao, Yinghui
    Bai, Hongtao
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [34] Solving the theater distribution vehicle routing and scheduling problem using group theoretic tabu search
    Crino, JR
    Moore, JT
    Barnes, JW
    Nanry, WP
    MATHEMATICAL AND COMPUTER MODELLING, 2004, 39 (6-8) : 599 - 616
  • [35] A precedence constrained flow shop scheduling problem with transportation time, breakdown times, and weighted jobs
    Thangaraja, M.
    Kumar, T. Jayanth
    Nandan, K. R.
    JOURNAL OF PROJECT MANAGEMENT, 2022,
  • [36] A precedence constrained flow shop scheduling problem with transportation time, breakdown times, and weighted jobs
    Thangaraj, M.
    Kumar, T. Jayanth
    Nandan, K. R.
    JOURNAL OF PROJECT MANAGEMENT, 2022, 7 (04) : 229 - 240
  • [37] A Genetic Algorithm Enhanced by Tabu Search for the Single Machine Scheduling Problem with Deteriorating Jobs
    Liu, Yueyue
    Zhang, Rui
    ADVANCED TECHNOLOGIES IN MANUFACTURING, ENGINEERING AND MATERIALS, PTS 1-3, 2013, 774-776 : 1842 - 1846
  • [38] SOLVING LARGE-SCALE TOUR SCHEDULING PROBLEMS
    JARRAH, AIZ
    BARD, JF
    DESILVA, AH
    MANAGEMENT SCIENCE, 1994, 40 (09) : 1124 - 1144
  • [39] Adaptive problem-solving for large-scale scheduling problems: A case study
    Gratch, J
    Chien, S
    JOURNAL OF ARTIFICIAL INTELLIGENCE RESEARCH, 1996, 4 : 365 - 396
  • [40] Scheduling algorithm for AND/OR precedence constrained tasks based on solving the set-cover problem
    College of Computer Science and Technology, Harbin Engineering University, Harbin 150001, China
    Harbin Gongcheng Daxue Xuebao, 2007, 5 (559-565):