共 50 条
- [2] A Flow Shop Scheduling Problem with Transportation Time and Separated Setup Time of Jobs INTERNATIONAL CONFERENCE ON MODELLING OPTIMIZATION AND COMPUTING, 2012, 38 : 1327 - 1332
- [3] Scheduling Precedence-Constrained Jobs on Two Resources to Minimize the Total Weighted Completion Time PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IEEE-IESM 2013), 2013, : 592 - 598
- [5] Maximizing the weighted number of just-in-time jobs in flow shop scheduling Journal of Scheduling, 2007, 10 : 237 - 243
- [8] Scheduling precedence-constrained jobs with Stochastic processing times on parallel machines PROCEEDINGS OF THE TWELFTH ANNUAL ACM-SIAM SYMPOSIUM ON DISCRETE ALGORITHMS, 2001, : 589 - 590
- [10] Minimizing the Number of Tardy Jobs in Flow Shop Sequence Dependent Setup Times Scheduling Problem MECHANICAL AND AEROSPACE ENGINEERING, PTS 1-7, 2012, 110-116 : 4063 - 4069