Multi-user-oriented manufacturing service scheduling with an improved NSGA-II approach in the cloud manufacturing system

被引:31
|
作者
Wang, Tianri [1 ,2 ]
Zhang, Pengzhi [1 ]
Liu, Juan [1 ]
Gao, Liqing [1 ,2 ]
机构
[1] Taiyuan Univ Technol, Sch Econ & Management, Taiyuan 030024, Peoples R China
[2] Taiyuan Univ Technol, Postgrad Educ Innovat Ctr Big Data Management & A, Taiyuan 030024, Peoples R China
基金
中国国家自然科学基金;
关键词
Cloud manufacturing; manufacturing management; task scheduling; multiple users; NSGA-II;
D O I
10.1080/00207543.2021.1893851
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Manufacturing service scheduling (MSS) is an important step in managing the social resource services in the cloud manufacturing (CMfg) system. However, recent research investigates the problem almost from the task level, and little research considers the demands of multiple users in MSS problem. In this paper, the obvious characteristics of multi-user-oriented MSS are analysed by comparing with the multi-task-oriented MSS problem, and then a multi-user-oriented MSS mathematical model is built to cater to the practical demands of multiple users. In order to solve the proposed model, an improved NSGA-II (INSGA-II), integrating k-means algorithm and local search strategy, is developed to improve the quality of solutions. Six scenarios are given to verify the effectiveness of the proposed algorithm by comparing with other three algorithms from four metrics. The flexibility and universality of the proposed model is examined and the effect of user requirements on the Pareto solution is analysed. The results present the efficiency of k-means cluster and local search in the INSGA-II algorithm and provide a practical solution to select the better schedule for users.
引用
收藏
页码:2425 / 2442
页数:18
相关论文
共 50 条
  • [41] An NSGA II-Based Approach for Optimization of Reconfigurable Cellular Manufacturing System
    Kant, Rajeev
    Pandey, Vijay
    Pattanaik, L. N.
    ADVANCES IN COMPUTATIONAL INTELLIGENCE, 2017, 509 : 57 - 66
  • [42] Multi-objective Task Scheduling to Minimize Energy Consumption and Makespan of Cloud Computing Using NSGA-II
    Sofia, A. Sathya
    GaneshKumar, P.
    JOURNAL OF NETWORK AND SYSTEMS MANAGEMENT, 2018, 26 (02) : 463 - 485
  • [43] A NSGA-II based approach for multi-objective optimization of a reconfigurable manufacturing transfer line supported by Digital Twin: A case study
    Ali, M. A.
    Alarjani, A.
    Mumtaz, M. A.
    ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2023, 18 (01): : 116 - 129
  • [44] Multi-objective Task Scheduling to Minimize Energy Consumption and Makespan of Cloud Computing Using NSGA-II
    A. Sathya Sofia
    P. GaneshKumar
    Journal of Network and Systems Management, 2018, 26 : 463 - 485
  • [45] A modified bi-objective NSGA-II approach to sustainability in reconfiguration planning of dynamic cellular manufacturing systems
    Sibanda, M. M.
    Padayachee, J.
    ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2024, 19 (02):
  • [46] A reinforcement learning based approach for multi-projects scheduling in cloud manufacturing
    Chen, Shengkai
    Fang, Shuiliang
    Tang, Renzhong
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (10) : 3080 - 3098
  • [47] Multi-objective optimization of integrated energy system based on improved NSGA-II algorithm
    Mei, Rui
    Wu, Tao
    Geng, Deji
    Zhang, Minzi
    Liu, Yanan
    Qian, Xusheng
    Sun, Yonghui
    PROCEEDINGS OF THE 39TH CHINESE CONTROL CONFERENCE, 2020, : 1721 - 1726
  • [48] Multi-Objective Cloud Manufacturing Service Selection and Scheduling with Different Objective Priorities
    He, Wei
    Jia, Guozhu
    Zong, Hengshan
    Huang, Tao
    SUSTAINABILITY, 2019, 11 (17)
  • [49] Modelling and an improved NSGA-II algorithm for sustainable manufacturing systems with energy conservation under environmental uncertainties: a case study
    Ayyoubzadeh, Behnam
    Ebrahimnejad, Sadoullah
    Bashiri, Mahdi
    Baradaran, Vahid
    Hosseini, Seyed Mohammad Hassan
    INTERNATIONAL JOURNAL OF SUSTAINABLE ENGINEERING, 2021, 14 (03) : 255 - 279
  • [50] MULTI-OBJECTIVE ENERGY-SAVING JOB-SHOP SCHEDULING BASED ON IMPROVED NSGA-II
    Huo, D. X.
    Xiao, X. J.
    Pan, Y. J.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2020, 19 (03) : 494 - 504