共 50 条
- [21] Multi-Agent Scheduling System in Cloud Manufacturing Environment 2020 10TH INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS INTERNATIONAL CONFERENCE ON CYBER TECHNOLOGY IN AUTOMATION, CONTROL, AND INTELLIGENT SYSTEMS (IEEE-CYBER 2020), 2020, : 374 - 378
- [23] Surgical operation scheduling with multi-resource constrained based on the improved NSGA-II algorithm Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2012, 32 (06): : 1337 - 1345
- [25] Improved NSGA-II Algorithm for Multi-objective Scheduling Problem in Hybrid Flow Shop INNOVATIVE TECHNIQUES AND APPLICATIONS OF MODELLING, IDENTIFICATION AND CONTROL, 2018, 467 : 273 - 289
- [27] Improved NSGA-II for the multi-objective flexible job-shop scheduling problem Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2010, 46 (11): : 156 - 164
- [29] Multi-objective Optimization of Resource Scheduling in Fog Computing Using an Improved NSGA-II Wireless Personal Communications, 2018, 102 : 1369 - 1385
- [30] Improved NSGA-II Algorithm for Multi-objective Scheduling Problem in Hybrid Flow Shop 2017 9TH INTERNATIONAL CONFERENCE ON MODELLING, IDENTIFICATION AND CONTROL (ICMIC 2017), 2017, : 740 - 745