共 50 条
- [41] Influences of water level rise on dynamic responses and long-term settlement of high-speed railway subgrade Jiaotong Yunshu Gongcheng Xuebao/Journal of Traffic and Transportation Engineering, 2023, 23 (04): : 75 - 91
- [42] Soil Arching Effect in High-Speed Railway GRPS Embankment Subjected to Long-Term Traffic Loading PROCEEDINGS OF THE SIXTH INTERNATIONAL CONFERENCE ON TRANSPORTATION ENGINEERING (ICTE 2019), 2019, : 803 - 812
- [43] Prediction method for long-term settlements of high-speed railway subgrade under influences of nearby loads Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2019, 41 (04): : 625 - 630
- [45] High-repetition-rate UV laser with CLBO and its reliability for long-term operation Pacific Rim Conference on Lasers and Electro-Optics, CLEO - Technical Digest, 2000,
- [46] Long-term monitoring technology of beijing-shanghai high-speed railway elevated station track system J. Railw. Eng. Soc., 5 (35-41):
- [47] Numerical prediction of wave-induced long-term extreme load effects in a flexible high-speed pentamaran Journal of Marine Science and Technology, 2006, 11 : 39 - 51
- [50] STUDY ON METHOD OF HIGH-SPEED RAILWAY BRIDGE PIER AND ABUTMENT PILE FOUNDATION SETTLEMENT LONG-TERM MONITORING KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 724 - 729