Reliability Test Rig of the Motorized Spindle and Improvements on Its Ability for High-Speed and Long-Term Tests

被引:4
|
作者
Yang, Zheng [1 ]
Chen, Fei [2 ]
Luo, Wei [1 ]
Xu, Binbin [2 ]
Wang, Song [3 ]
机构
[1] Jilin Univ, Sch Mech & Aerosp Engn, Minist Educ, Key Lab CNC Equipment Reliabil, Changchun, Peoples R China
[2] Shenzhen Technol Univ, Sino German Coll Intelligent Mfg, Shenzhen, Peoples R China
[3] Lishui Zhejiang Founder Motor Co Ltd, Lishui, Peoples R China
关键词
Machining - Reliability analysis - Bode diagrams - Alignment;
D O I
10.1155/2021/6637335
中图分类号
O42 [声学];
学科分类号
070206 ; 082403 ;
摘要
To realize the accurate performance test under high-speed operation and the long-term stable reliability test of the motorized spindle, a reliability test rig (RTR) which can simulate the cutting force in the actual machining process is presented. Firstly, a reasonable prototype integrating dynamic force loading devices and torque loading devices is designed and established based on the load analysis of the spindle, and a complete and explicit control strategy of the reliability loading test is designed. Secondly, the effects of misalignment of the diaphragm coupling caused by assembling are analyzed, and experiments are conducted to test the axis orbit of the motorized spindle. The experimental results illustrate that the axis orbit can identify the occurrence of misalignment, which ensures timely adjustment of misalignment and the accurate performance test under high-speed operation. Lastly, a damper is added in the mechanical structure of the electrohydraulic servo loading system (EHSLS), and the comparison of Bode maps before and after optimization is analyzed by the Nyquist criterion. After the optimization, the gain and phase margin of the Bode diagram are 12.9 dB and 57.2 degrees, respectively, which are both within the stable range and validate the improvements on the ability of long-term reliability tests of the motorized spindle. The presented RTR is able to simulate the actual cutting force and provides an efficient loading approach to guarantee the accuracy and stability of motorized spindle tests.
引用
收藏
页数:14
相关论文
共 50 条
  • [21] Stochastic prediction of high-speed train dynamics to long-term evolution of track irregularities
    Lestoille, N.
    Soize, C.
    Funfschilling, C.
    MECHANICS RESEARCH COMMUNICATIONS, 2016, 75 : 29 - 39
  • [22] A C++ framework for conducting high-speed, long-term particle tracking simulations
    Kabel, A
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 778 - 780
  • [23] Evaluation of the first series of long-term measurements on the Hanover-Berlin high-speed line
    Le, R
    Ripke, B
    WAVE 2000: WAVE PROPAGATION, MOVING LOAD, VIBRATION REDUCTION, 2000, : 185 - 194
  • [24] Long-term investigation of erosion behaviors on metal surfaces by impingement of liquid droplet with high-speed
    Duk Hyun Choi
    Kyung Hoon Kim
    Hyung Joon Kim
    Journal of Mechanical Science and Technology, 2015, 29 : 1085 - 1091
  • [25] Stochastic analysis of long-term deformation of reinforced concrete arch bridges for high-speed railways
    Ma, Kun
    Xiang, Tianyu
    Zhao, Renda
    Xu, Yong
    Xie, Haiqing
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2012, 45 (11): : 141 - 146
  • [26] Fatigue failure mechanism of high-speed train bearing steel after long-term service
    Li, He-Fei
    Zhao, Xue-Yuan
    Yang, Shao-Pu
    Wei, Jia-Liang
    Gu, Xiao-Hui
    Liu, Yong-Qiang
    Liu, Peng-Fei
    Duan, Shu-Yong
    Wang, Xiao-Di
    ENGINEERING FAILURE ANALYSIS, 2024, 165
  • [27] Research on the shrinkage and creep and changes of long-term deflection of high-speed rail continuous beam
    Shijiazhuang Tiedao University, Shijiazhuang
    Hebei
    050043, China
    不详
    Anhui
    230011, China
    J. Railw. Eng. Soc., 5 (49-53):
  • [28] Modulation of fluidic resistance and capacitance for long-term, high-speed feedback control of a microfluidic interface
    Kim, YongTae
    Kuczenski, Brandon
    LeDuc, Philip R.
    Messner, William C.
    LAB ON A CHIP, 2009, 9 (17) : 2603 - 2609
  • [29] LONG-TERM MONITORING OF HIGH-SPEED RAILWAY TRACK USING OPTICAL FIBER SENSING TECHNIQUES
    Lin, Chao
    Gao, Liang
    Cai, Xiaopei
    Dai, Junxue
    Zhang, Cheng
    CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 425 - 428
  • [30] Assessment of passenger long-term vibration discomfort: a field study in high-speed train environments
    Peng, Yong
    Wu, Zhifa
    Fan, Chaojie
    Zhou, Jiahao
    Yi, Shengen
    Peng, Yuexiang
    Gao, Ke
    ERGONOMICS, 2022, 65 (04) : 659 - 671