摘要
Timetabling problems have been much studied over the last decade. Due to the complexity and the variety of such problems, most work concerns static problems in which activities to schedule and resources are known in advance, and constraints are fixed. However, every timetabling problem is subject to unexpected events (for example, for university timetabling problems, a missing teacher, or a slide projector breakdown). In such a situation, one has to quickly build a new solution which takes these events into account and which is preferably not too different from the current one. We introduce in this paper constraint-programming-based tools for solving dynamic timetabling problems modelled as Resource-Constrained Project Scheduling Problems. This approach uses explanation-based constraint programming and operational research techniques.
引用
收藏
页码:39 / 59
页数:21
相关论文
共 50 条
  • [41] (DP)2SM:: A dynamic approach to resource constraint project scheduling
    Khamooshi, H
    COMPUTERS & INDUSTRIAL ENGINEERING, 1998, 35 (3-4) : 507 - 510
  • [42] (DP)2SM: A dynamic approach to resource constraint project scheduling
    Khamooshi, Homayoun
    Computers and Industrial Engineering, 1998, 35 (3-4): : 507 - 510
  • [43] Interactively solving school timetabling problems using extensions of constraint programming
    Cambazard, H
    Demazeau, F
    Jussien, N
    David, P
    PRACTICE AND THEORY OF AUTOMATED TIMETABLING V, 2005, 3616 : 190 - 207
  • [44] A Constraint-Based Approach to Modeling and Solving Resource-Constrained Scheduling Problems
    Sitek, Pawel
    Wikarek, Jaroslaw
    COMPUTATIONAL COLLECTIVE INTELLIGENCE, ICCCI 2016, PT I, 2016, 9875 : 423 - 433
  • [45] Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems
    Kreter, Stefan
    Schutt, Andreas
    Stuckey, Peter J.
    Zimmermann, Juergen
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 266 (02) : 472 - 486
  • [46] A Constraint Programming Approach for Solving Patient Transportation Problems
    Cappart, Quentin
    Thomas, Charles
    Schaus, Pierre
    Rousseau, Louis-Martin
    PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING, 2018, 11008 : 490 - 506
  • [47] Solving a log-truck scheduling problem with constraint programming
    El Hachemi, Nizar
    Gendreau, Michel
    Rousseau, Louis-Martin
    INTEGRATION OF AI AND OR TECHNIQUES IN CONSTRAINT PROGRAMMING FOR COMBINATORIAL OPTIMIZATION PROBLEMS, 2008, 5015 : 293 - 297
  • [48] Solving production scheduling with earliness/tardiness penalties by constraint programming
    Jan Kelbel
    Zdeněk Hanzálek
    Journal of Intelligent Manufacturing, 2011, 22 : 553 - 562
  • [49] Solving production scheduling with earliness/tardiness penalties by constraint programming
    Kelbel, Jan
    Hanzalek, Zdenek
    JOURNAL OF INTELLIGENT MANUFACTURING, 2011, 22 (04) : 553 - 562
  • [50] Solving a Supply-Delivery Scheduling Problem with Constraint Programming
    Giles, Katherine
    van Hoeve, Willem-Jan
    PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING, CP 2016, 2016, 9892 : 602 - 617