Solving dynamic resource constraint project scheduling problems using new constraint programming tools

被引:0
|
作者
Elkhyari, A
Guéret, C
Jussien, N
机构
[1] Ecole Mines Nantes, F-44307 Nantes 3, France
[2] Inst Rech Commun & Cybernet, Nantes, France
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Timetabling problems have been much studied over the last decade. Due to the complexity and the variety of such problems, most work concerns static problems in which activities to schedule and resources are known in advance, and constraints are fixed. However, every timetabling problem is subject to unexpected events (for example, for university timetabling problems, a missing teacher, or a slide projector breakdown). In such a situation, one has to quickly build a new solution which takes these events into account and which is preferably not too different from the current one. We introduce in this paper constraint-programming-based tools for solving dynamic timetabling problems modelled as Resource-Constrained Project Scheduling Problems. This approach uses explanation-based constraint programming and operational research techniques.
引用
收藏
页码:39 / 59
页数:21
相关论文
共 50 条
  • [11] A NEW HEURISTIC FOR PROJECT SCHEDULING WITH A SINGLE RESOURCE CONSTRAINT
    KHATTAB, M
    CHOOBINEH, F
    COMPUTERS & INDUSTRIAL ENGINEERING, 1990, 19 (1-4) : 514 - 518
  • [12] A constraint programming approach for the resource-constrained project scheduling problem
    Liess, Olivier
    Michelon, Philippe
    ANNALS OF OPERATIONS RESEARCH, 2008, 157 (01) : 25 - 36
  • [13] A Constraint Integer Programming Approach for Resource-Constrained Project Scheduling
    Berthold, Timo
    Heinz, Stefan
    Luebbecke, Marco E.
    Moehring, Rolf H.
    Schulz, Jens
    INTEGRATION OF AI AND OR TECHNIQUES IN CONSTRAINT PROGRAMMING FOR COMBINATORIAL OPTIMIZATION PROBLEMS, 2010, 6140 : 313 - +
  • [14] A constraint programming approach for the resource-constrained project scheduling problem
    Olivier Liess
    Philippe Michelon
    Annals of Operations Research, 2008, 157 : 25 - 36
  • [15] Combining Constraint Programming and Genetic Algorithm for Dynamic Scheduling Problems
    Elkhyari, Abdallah
    Bellabdaoui, Adil
    2017 INTERNATIONAL COLLOQUIUM ON LOGISTICS AND SUPPLY CHAIN MANAGEMENT (LOGISTIQUA), 2017, : 19 - 24
  • [16] Constraint Logic Programming and scheduling problems
    Varnier, C
    Baptiste, P
    INFORMATION INTELLIGENCE AND SYSTEMS, VOLS 1-4, 1996, : 2942 - 2946
  • [17] Dynamic Priority-Dynamic Programming Scheduling Method (DP)2SM: A dynamic approach to resource constraint project scheduling
    Nene Univ Coll, Northampton, United Kingdom
    Int J Proj Manage, 6 (383-391):
  • [18] A New Hybrid Algorithm for the Resource Constraint Project Scheduling Problem
    Jain, Rashank
    Husain, Asim
    Jussibaliyeva, Aruzhan
    Khassenova, Kenzhegul
    Shamisheva, Nurgul
    Sagindykova, Gulnara
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2022, 21 (03): : 492 - 502
  • [19] A new constraint programming model and solving for the cyclic hoist scheduling problem
    Wallace, Mark
    Yorke-Smith, Neil
    CONSTRAINTS, 2020, 25 (3-4) : 319 - 337
  • [20] Solving Distributed Constraint Optimization Problems Using Logic Programming
    Tiep Le
    Tran Cao Son
    Pontelli, Enrico
    Yeoh, William
    PROCEEDINGS OF THE TWENTY-NINTH AAAI CONFERENCE ON ARTIFICIAL INTELLIGENCE, 2015, : 1174 - 1181