A process model for bricolage-based resource co-management for a resource-constrained government IT project Lessons learned from Taiwan's DOC project

被引:3
|
作者
Chen, Chung-Chi [1 ]
Lee, Gwo-Guang [1 ]
Chou, Tzu-Chuan [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Informat Management, Taipei, Taiwan
关键词
Grounded theory; Digital divide; Co-creation; Alliances; Organizational learning; Collaboration; Case study; CO-CREATION; TECHNOLOGY; MANAGEMENT; INNOVATION; STRATEGY; COMPETENCES; ECOSYSTEMS; AGILITY; FIRMS;
D O I
10.1108/ITP-05-2014-0099
中图分类号
G25 [图书馆学、图书馆事业]; G35 [情报学、情报工作];
学科分类号
1205 ; 120501 ;
摘要
Purpose - The purpose of this paper is to examine the ways in which central government in resource-constrained environments collaborates with local government to utilize the available resources at hand to set up 300 Digital Opportunity Centers (DOCs) in 168 remote areas in Taiwan through co-management to bricolage new resources and new capabilities, gradually bridging the urban-rural digital divide to co-create values for local development. Design/methodology/approach - This study adopted an in-depth case study. The authors selected Taiwan's DOC, the largest public information service infrastructure project in Taiwan, to explore issues related to bricolage-based resource co-management. Findings - From the integrating relevant literature, the generic process of bricolage-based resource co-management can be inferred to consist of four major steps. Applying this body of knowledge as a theoretical lens to analyze the case of Taiwan's DOC, a process model of bricolage-based resource co-management is inductively derived to address the research questions. Research limitations/implications - A common criticism of this methodology is its lack of generalizability since a case study cannot prove itself in a statistical sense. Practical implications - This study is significant in that it provides a comprehensive and empirically supported framework. The authors hope that practitioners who face resource constraints when conducting large-scale IT projects can use the process model developed in this study as a detailed roadmap to identify the most appropriate actions and steps to undertake. Originality/value - This study provides an empirically grounded framework that contributes toward addressing the lack of empirical studies in bricolage-based, resource co-management research.
引用
收藏
页码:200 / 220
页数:21
相关论文
共 15 条
  • [1] Construction Schedule Management Using Resource-Constrained Project Scheduling Model
    Wang J.
    Zeng S.
    Ju J.
    Tongji Daxue Xuebao/Journal of Tongji University, 2017, 45 (10): : 1561 - 1568
  • [2] Disruption management for resource-constrained project scheduling based on differential evolution algorithm
    Chen, Weiming
    Ni, Xiaoyang
    Guo, Hailin
    Computer Modelling and New Technologies, 2014, 18 (04): : 145 - 153
  • [3] Resource-constrained Scheduling of a Real Project from the Construction Industry: A Comparison of Software Packages for Project Management
    Trautmann, N.
    Baumann, P.
    2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 628 - 632
  • [4] SITE-BASED AND RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM: MODEL AND HEURISTICS
    Zheng, Yuan-Li
    Luo, Yong-Liang
    Lin, You-Fang
    Wei, Zheng-Sheng
    2013 10TH INTERNATIONAL COMPUTER CONFERENCE ON WAVELET ACTIVE MEDIA TECHNOLOGY AND INFORMATION PROCESSING (ICCWAMTIP), 2013, : 62 - 68
  • [5] Monitoring and evaluation to support adaptive co-management: Lessons learned from the Millennium Villages Project
    Chapman, Sarah
    Sullivan, Clare
    Palm, Cheryl
    Huynh, Uyen
    Diru, William
    Masira, Jessica
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2016, 183 : 142 - 151
  • [6] Resource-constrained project scheduling through the goal programming model: integration of the manager's preferences
    Gagnon, Michel
    d'Avignon, Gilles
    Aouni, Belaid
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2012, 19 (04) : 547 - 565
  • [7] Landscape co-management and livelihood sustainability: Lessons learned from the billion trees afforestation project in Pakistan
    Ullah, Ayat
    Zeb, Alam
    Saqib, Shahab E.
    Kaechele, Harald
    LAND USE POLICY, 2022, 115
  • [8] An Assignment-Based Continuous-Time MILP Model for the Resource-Constrained Project Scheduling Problem
    Rihm, Tom
    Trautmann, Norbert
    2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 35 - 39
  • [9] An S-graph based approach for multi-mode resource-constrained project scheduling with time-varying resource capacities
    Osz O.
    Hegyháti M.
    2018, Italian Association of Chemical Engineering - AIDIC (70): : 1165 - 1170
  • [10] An interval programming based approach for fully uncertain resource-constrained project scheduling problem considering project manager's attitude toward risk
    Subulan, Kemal
    PAMUKKALE UNIVERSITY JOURNAL OF ENGINEERING SCIENCES-PAMUKKALE UNIVERSITESI MUHENDISLIK BILIMLERI DERGISI, 2019, 25 (04): : 481 - 497