Commissioning the cryogenic system of the first LHC sector

被引:0
|
作者
Millet, F. [1 ]
Claudet, S. [1 ]
Ferlin, G. [1 ]
Perin, A. [1 ]
Rabehl, R. [3 ]
Riddone, G. [1 ]
Ronayette, L. [2 ]
Serio, L. [1 ]
Soubiran, M. [1 ]
Tavian, L. [1 ]
机构
[1] CERN, Accelerator Technol Dept, CH-1211 Geneva 23, Switzerland
[2] CNRS, Grenoble High Magnet Field Lab, F-38042 Grenoble, France
[3] Fermi Lab, Batavia, IL 60510 USA
关键词
LHC; large scale cryogenic system; refrigeration; superfluid helium;
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
The LHC machine, composed of eight sectors with superconducting magnets and accelerating cavities requires a complex cryogenic system providing high cooling capacities (18 kW equivalent at 4.5 K and 2.4 kW at 1.8 K per sector produced in large cold boxes and distributed via 3.3-km cryogenic transfer lines). After individual reception tests of the cryogenic subsystems (cryogen storages, refrigerators, cryogenic transfer lines and distribution boxes) performed since 2000, the commissioning of the cryogenic system of the first LHC sector has been under way since November 2006. After a brief introduction to the LHC cryogenic system and its specificities, the commissioning is reported detailing the preparation phase (pressure and leak tests, circuit conditioning and flushing), the cool-down sequences including the handling of cryogenic fluids, the magnet powering phase and finally the warm-up. Preliminary conclusions on the commissioning of the first LHC sector will be drawn with the review of the critical points already solved or still pending. The last part of the paper reports on the first operational experience of the LHC cryogenic system in the perspective of the commissioning of the remaining LHC sectors and the beam injection test.
引用
收藏
页码:1403 / +
页数:2
相关论文
共 50 条
  • [41] COMMISSIONING RESULTS OF THE JT-60SA CRYOGENIC SYSTEM
    Christine, Hoa
    Francois, Bonne
    Pascal, Roussel
    Valerie, Lamaison
    Sylvain, Girard
    Pascal, Fejoz
    Romain, Goncalves
    Jean-Claude, Vallet
    Jerome, Legrand
    Babtiste, Langevin
    Michel, Maccagnan
    Vincent, Pudys
    Manfred, Wanner
    Antonino, Cardella
    Enrico, Di Pietro
    Koji, Kamiya
    Kyohei, Natsume
    Kiichi, Ohtsu
    Makoto, Oishi
    Atsushi, Honda
    Yoshitoshi, Kashiwa
    Kaname, Kizu
    Yoshihiko, Koide
    14TH CRYOGENICS 2017 IIR INTERNATIONAL CONFERENCE (CRYOGENICS 2017), 2017, : 126 - 131
  • [42] THE CRYOGENIC SYSTEM FOR NEUROSPIN LABORATORY: MAIN FEATURES AND REFRIGERATOR COMMISSIONING
    Crispel, S.
    Bredy, P.
    Gratiot, F.
    Grillot, D.
    Lannou, H.
    Mantileri, C.
    Flavien, G.
    Deshildre, C.
    Roussel, T.
    ADVANCES IN CRYOGENIC ENGINEERING, VOLS 57A AND 57B, 2012, 1434 : 110 - 117
  • [43] Commissioning of the Scintillator Pad Detector of LHCb with cosmic rays and first LHC collisions
    Vazquez Gomez, Ricardo
    XIV INTERNATIONAL CONFERENCE ON CALORIMETRY IN HIGH ENERGY PHYSICS (CALOR 2010), 2011, 293
  • [44] Commissioning of the LHC Injectors Upgrade fast wire scanners and first experimental results
    Di Carlo, S.
    Emery, J.
    Andreazza, W.
    Belohrad, D.
    Felipe, J. C. Esteban
    Goldblatt, A.
    Gudkov, D.
    Guerrero, A.
    Jackson, S.
    Lacarrere, G. O.
    Nieto, M. Martin
    Rinaldi, A. T.
    Roncarolo, F.
    Schillinger, C.
    Veness, R.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2023, 1053
  • [45] First commissioning of the SuperKEKB vacuum system
    Suetsugu, Y.
    Shibata, K.
    Ishibashi, T.
    Kanazawa, K.
    Shirai, M.
    Terui, S.
    Hisamatsu, H.
    PHYSICAL REVIEW ACCELERATORS AND BEAMS, 2016, 19 (12):
  • [46] The Atlas Liquid Argon Calorimeter: Commissioning with Cosmic Muons and First LHC Beams
    Trocme, B.
    NUCLEAR PHYSICS B-PROCEEDINGS SUPPLEMENTS, 2009, 197 : 139 - 142
  • [47] The Cryogenic System and Planned Cryogenic Tests For the Future High Luminosity LHC IT Magnet String
    Perin, Antonio
    Sisti, Michele
    Claudet, Serge
    van Weelderen, Rob
    Bajko, Marta
    Dhalla, Fahim
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2019, 29 (05)
  • [48] Sns cryogenic systems commissioning
    Hatfield, D.
    Casagrande, F.
    Campisi, I.
    Gurd, P.
    Howell, M.
    Stout, D.
    Strong, H.
    Arenius, D.
    Creel, J.
    Dixon, K.
    Ganni, V.
    Knudsen, P.
    ADVANCES IN CRYOGENIC ENGINEERING, VOLS 51A AND B, 2006, 823 : 1436 - +
  • [49] Construction, commissioning, and cryogenic performances of the first TESLA test facility (TTF) cryomodule
    Pagani, C
    Weisend, JG
    Bandelmann, R
    Barni, D
    Bosotti, A
    Grygiel, G
    Kaiser, H
    Knopf, U
    Lange, R
    Loeffler, F
    Pierini, P
    Peters, O
    Petersen, B
    Sellmann, D
    Wolff, S
    ADVANCES IN CRYOGENIC ENGINEERING, VOL 43 PTS A AND B, 1998, 43 : 87 - 96
  • [50] Cryogenic system and cryostat design for the LHC IR quadrupole magnets
    Huang, Y
    Kerby, J
    Nicol, T
    Peterson, T
    ADVANCES IN CRYOGENIC ENGINEERING, VOL 43 PTS A AND B, 1998, 43 : 403 - 410