Commissioning the cryogenic system of the first LHC sector

被引:0
|
作者
Millet, F. [1 ]
Claudet, S. [1 ]
Ferlin, G. [1 ]
Perin, A. [1 ]
Rabehl, R. [3 ]
Riddone, G. [1 ]
Ronayette, L. [2 ]
Serio, L. [1 ]
Soubiran, M. [1 ]
Tavian, L. [1 ]
机构
[1] CERN, Accelerator Technol Dept, CH-1211 Geneva 23, Switzerland
[2] CNRS, Grenoble High Magnet Field Lab, F-38042 Grenoble, France
[3] Fermi Lab, Batavia, IL 60510 USA
关键词
LHC; large scale cryogenic system; refrigeration; superfluid helium;
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
The LHC machine, composed of eight sectors with superconducting magnets and accelerating cavities requires a complex cryogenic system providing high cooling capacities (18 kW equivalent at 4.5 K and 2.4 kW at 1.8 K per sector produced in large cold boxes and distributed via 3.3-km cryogenic transfer lines). After individual reception tests of the cryogenic subsystems (cryogen storages, refrigerators, cryogenic transfer lines and distribution boxes) performed since 2000, the commissioning of the cryogenic system of the first LHC sector has been under way since November 2006. After a brief introduction to the LHC cryogenic system and its specificities, the commissioning is reported detailing the preparation phase (pressure and leak tests, circuit conditioning and flushing), the cool-down sequences including the handling of cryogenic fluids, the magnet powering phase and finally the warm-up. Preliminary conclusions on the commissioning of the first LHC sector will be drawn with the review of the critical points already solved or still pending. The last part of the paper reports on the first operational experience of the LHC cryogenic system in the perspective of the commissioning of the remaining LHC sectors and the beam injection test.
引用
收藏
页码:1403 / +
页数:2
相关论文
共 50 条
  • [31] Design, development and commissioning of the control system for the cryogenic distribution system at ESS
    Asensi, E.
    Arnold, P.
    van Velze, P.
    Magnusson, E.
    Nilsson, P.
    Zhang, J.
    Domagala, D.
    Binczyk, W.
    Gaj, W.
    Maciocha, W.
    ADVANCES IN CRYOGENIC ENGINEERING: PROCEEDINGS OF THE CRYOGENIC ENGINEERING CONFERENCE, CEC 2023, 2024, 1301
  • [32] Commissioning and Performance of the ATLAS Calorimeter System with proton collision at LHC
    Pralavorio, Pascal
    35TH INTERNATIONAL CONFERENCE OF HIGH ENERGY PHYSICS (ICHEP 2010), 2010,
  • [33] Radiation tolerant D/A converters for the LHC cryogenic system
    Franco, FJ
    Zong, Y
    de Agapito, JA
    Marques, JG
    Fernandes, AC
    Casas-Cubillos, J
    Rodriguez-Ruiz, MA
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2005, 553 (03): : 604 - 612
  • [34] Status of the installation and of commissioning of the LHC
    Saban, R.
    NUOVO CIMENTO DELLA SOCIETA ITALIANA DI FISICA B-GENERAL PHYSICS RELATIVITY ASTRONOMY AND MATHEMATICAL PHYSICS AND METHODS, 2008, 123 (3-4): : 273 - 278
  • [35] The commissioning of the LHC technical systems
    Saban, Roberto
    Alemany-Fernandez, Reyes
    Baggiolini, Vito
    Ballarino, Amalia
    Barbero-Soto, Esther
    Bellesia, Boris
    Bordry, Frederick
    Bozzini, Davide
    Casas-Lino, Maria-Paz
    Chareyre, Vincent
    Claudet, Serge
    Coelingh, Gert-Jan
    Dahlerup-Petersen, Knud
    Denz, Reiner
    Feher, Sandor
    Flora, Robert
    Gruwe, Magali
    Kain, Verena
    Kirby, Glyn
    Koratzinos, Michael
    Lauckner, Robin
    Le Naour, Sandrine
    Mess, Karl-Hubert
    Millet, Francois
    Montabonnet, Valerie
    Nisbet, David
    Perea-Solano, Blanca
    Pojer, Mirko
    Principe, Rosario
    Rabehl, Roger
    Rijllart, Adriaan
    Redaelli, Stefano
    Rodriguez-Mateos, Felix
    Schmidt, Rudiger
    Serio, Luigi
    Siemko, Andrzej
    Solfaroli-Camillocci, Matteo
    Thiesen, Hugues
    Venturini, Walter
    Vergara-Fernandez, Antonio
    Verweij, A. An
    Zerlauth, Markus
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 13 - 15
  • [36] LHC: Construction and commissioning status
    Evans, L.
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 1246 - 1250
  • [37] Commissioning the Magnet Safety System of the Cryogenic Pumping Section of KATRIN
    Gil, Woosik
    Hoehn, Thomas
    Petry, Klaus
    Wuestling, Sascha
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2017, 27 (04)
  • [38] LESSONS FROM COMMISSIONING AND OPERATIONS OF THE ICARUS CRYOGENIC SYSTEM AT FERMILAB
    Geynisman, Michael
    Bremer, Johan
    Chalifour, Michel
    Doubnik, Roza
    Fabre, Caroline
    Montanari, Claudio
    Nichols, Trevor
    Schwartz, Frederick
    Wilson, Peter
    Zuckerbrot, Michael
    17TH CRYOGENICS 2023, IIR INTERNATIONAL CONFERENCE, 2023, : 16 - 21
  • [39] LHC cryogenics hardware commissioning
    Avramidou, R. M.
    Anastasopoulos, K.
    Casas-Cubillos, J.
    Ciechanowski, M.
    Fampris, X.
    Gaj, W. M.
    Fernandez-Penacoba, G.
    Fluder, C.
    Gomes, P.
    Gousiou, E.
    Jeanmonod, N.
    Karagiannis, F.
    Koumparos, A.
    Macuda, P.
    Patsouli, A.
    Suraci, A.
    Vauthier, N.
    Vottis, C.
    2007 IEEE NUCLEAR SCIENCE SYMPOSIUM CONFERENCE RECORD, VOLS 1-11, 2007, : 1691 - +
  • [40] Preliminary commissioning of superconducting magnets and cryogenic system of BEPC II
    Zong, Z. G.
    Liu, L. Q.
    Xu, Q. J.
    Xlong, L. Y.
    Zhang, L.
    Li, S. P.
    He, K.
    INTERNATIONAL JOURNAL OF MODERN PHYSICS B, 2007, 21 (18-19): : 3163 - 3165