Commissioning the cryogenic system of the first LHC sector

被引:0
|
作者
Millet, F. [1 ]
Claudet, S. [1 ]
Ferlin, G. [1 ]
Perin, A. [1 ]
Rabehl, R. [3 ]
Riddone, G. [1 ]
Ronayette, L. [2 ]
Serio, L. [1 ]
Soubiran, M. [1 ]
Tavian, L. [1 ]
机构
[1] CERN, Accelerator Technol Dept, CH-1211 Geneva 23, Switzerland
[2] CNRS, Grenoble High Magnet Field Lab, F-38042 Grenoble, France
[3] Fermi Lab, Batavia, IL 60510 USA
关键词
LHC; large scale cryogenic system; refrigeration; superfluid helium;
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
The LHC machine, composed of eight sectors with superconducting magnets and accelerating cavities requires a complex cryogenic system providing high cooling capacities (18 kW equivalent at 4.5 K and 2.4 kW at 1.8 K per sector produced in large cold boxes and distributed via 3.3-km cryogenic transfer lines). After individual reception tests of the cryogenic subsystems (cryogen storages, refrigerators, cryogenic transfer lines and distribution boxes) performed since 2000, the commissioning of the cryogenic system of the first LHC sector has been under way since November 2006. After a brief introduction to the LHC cryogenic system and its specificities, the commissioning is reported detailing the preparation phase (pressure and leak tests, circuit conditioning and flushing), the cool-down sequences including the handling of cryogenic fluids, the magnet powering phase and finally the warm-up. Preliminary conclusions on the commissioning of the first LHC sector will be drawn with the review of the critical points already solved or still pending. The last part of the paper reports on the first operational experience of the LHC cryogenic system in the perspective of the commissioning of the remaining LHC sectors and the beam injection test.
引用
收藏
页码:1403 / +
页数:2
相关论文
共 50 条
  • [1] Validation and performance of the LHC cryogenic system through commissioning of the first sector
    Serio, L.
    Bouillot, A.
    Casas-Cubillos, J.
    Chakravarty, A.
    Claudet, S.
    Gicquel, F.
    Gomes, P.
    Kumar, M.
    Kush, P. K.
    Millet, F.
    Perin, A.
    Rabehl, R.
    Singh, M. R.
    Soubiran, M.
    Tavian, L.
    ADVANCES IN CRYOGENIC ENGINEERING, VOLS 53A AND 53B, 2008, 985 : 1411 - +
  • [2] Commissioning of the LHC cryogenic system: Subsystems cold commissioning in preparation of full sector tests
    Calzas, C.
    Ferlin, G.
    Gilbert, N.
    Gruehagen, H.
    Knoops, S.
    Parente, C.
    Sanmarti, M.
    Serio, L.
    ADVANCES IN CRYOGENIC ENGINEERING, VOLS 51A AND B, 2006, 823 : 1599 - +
  • [3] First Commissioning Results of the KSTAR Cryogenic System
    Kim, Yaung-Soo
    Park, Y. M.
    Lee, Y. J.
    Kwag, S. W.
    Chang, Y. B.
    Song, N. H.
    Woo, I. S.
    Park, H. T.
    Cho, K. W.
    Chang, H. S.
    Park, D. S.
    Joo, J. J.
    Moon, K. M.
    Park, K. R.
    Chu, Yong
    Yonekawa, Hirofumi
    Kim, Y. O.
    Bang, E. N.
    Kim, H. K.
    Kim, K. P.
    Park, M. K.
    Baek, S.
    Hong, J. S.
    Ha, T. H.
    Kim, Y. J.
    Hwang, I. S.
    Yang, H. L.
    Oh, Y. K.
    Bak, J. S.
    Kwon, M.
    Lee, G. S.
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2009, 19 (03) : 1577 - 1581
  • [4] STRATEGY FOR THE FIRST TWO MONTHS OF LHC BEAM COMMISSIONING (COMMISSIONING TO FIRST STABLE BEAMS)
    Redaelli, S.
    Arduini, G.
    Giovannozzi, M.
    Lamont, M.
    Tomas, R.
    Wenninger, J.
    CHAMONIX 2014: WORKSHOP ON LHC PERFORMANCE, 2015, : 125 - 128
  • [5] First experience with the LHC cryogenic instrumentation
    Vauthier, N.
    Avramidou, R.
    Balle, Ch.
    Casas-Cubillos, J.
    Ciechanowski, M.
    Femandez-Penacoba, G.
    Fortescue-Beck, E.
    Gomes, P.
    Jeanmonod, N.
    Lopez-Lorente, A.
    Suraci, A.
    ADVANCES IN CRYOGENIC ENGINEERING, VOLS 53A AND 53B, 2008, 985 : 957 - +
  • [6] The commissioning and the first operational experiences of the CMS RPC detector control system at LHC
    Polese, G.
    Paolucci, P.
    Viviani, C.
    Sharzad, H.
    Khurshid, T.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2012, 661 : S23 - S26
  • [7] LHC collimation system hardware commissioning
    Weiler, Th.
    Aberle, O.
    Assmann, R.
    Charnizo, R.
    Kadi, Y.
    Lettry, J.
    Losito, R.
    Redaelli, S.
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 2846 - 2848
  • [8] ARIEL E-linac Cryogenic System: Commissioning and First Operational Experience
    Koveshnikov, A.
    Bylinskii, I.
    Hodgson, G.
    Kishi, D.
    Laxdal, R.
    Ma, Y.
    Nagimov, R.
    Yosifov, D.
    ADVANCES IN CRYOGENIC ENGINEERING, 2015, 101
  • [9] Status of the cryogenic system commissioning at SNS
    Casagrande, F
    Campisi, I
    Gurd, P
    Hatfield, D
    Howell, M
    Stout, D
    Strong, H
    Arenius, D
    Creel, J
    Dixon, K
    Ganni, V
    Knudsen, P
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 3848 - 3850
  • [10] Preliminary commissioning of cryogenic system of BESIII
    Zong, Z. G.
    Liu, L. Q.
    Zhang, L.
    Li, S. P.
    He, K.
    Xiong, L. Y.
    ADVANCES IN CRYOGENIC ENGINEERING, VOLS 53A AND 53B, 2008, 985 : 461 - +