Predicting Project Cost Performance Level by Assessing Risk Factors of Building Construction in South Korea

被引:11
|
作者
Cha, Hee Sung [1 ]
Shin, Kang Yong [1 ]
机构
[1] Ajou Univ, Dept Architectural Engn, Suwon 443749, South Korea
基金
新加坡国家研究基金会;
关键词
building project; cost performance; quantitative analysis; risk assessment;
D O I
10.3130/jaabe.10.437
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
There exists a strong relationship between the level of planning effort and overall project performance. Project stakeholders are concerned about various project objectives among which cost performance has long been regarded as one of the most crucial. Recognizing the lack of a systematic approach in assessing building project risk in association with cost performance prediction, this study identified 49 risk factors from various sources and quantified the relative impact of each factor. By normalizing these values, a Project Risk Score (PRS) has been developed for the purpose of predicting cost performance on a particular project. The 13 real case studies showed a statistically significant relationship between the PRS and cost performance. Predicting cost performance is not simple. Project managers must consider not only factors that are innate to the project, but also project-independent circumstances. This study provides straightforward guidance in assessing a particular project in order to recognize the level of cost performance before project execution. This risk-based performance prediction can improve early-stage project evaluation and enhances the possibility of achieving a sustainable business in a challenging environment.
引用
收藏
页码:437 / 444
页数:8
相关论文
共 50 条
  • [31] Risk Management Application-Level Analysis in South Korea Construction Companies Using a Generic Risk Maturity Model
    Karunarathne, Batagalle Vinuri Gimanthika
    Kim, Byung-Soo
    KSCE JOURNAL OF CIVIL ENGINEERING, 2021, 25 (09) : 3235 - 3244
  • [32] Risk Management Application-Level Analysis in South Korea Construction Companies Using a Generic Risk Maturity Model
    Batagalle Vinuri Gimanthika Karunarathne
    Byung-Soo Kim
    KSCE Journal of Civil Engineering, 2021, 25 : 3235 - 3244
  • [33] Methods and applications of risk analysis on construction project cost
    Cheng Dewen
    Wu Yuhua
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON RISK ANALYSIS AND CRISIS RESPONSE, 2007, 2 : 98 - 102
  • [34] Factors influencing municipal construction project performance
    Alsulamy, Saleh
    Gupta, Naren
    Sloan, Brian
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MUNICIPAL ENGINEER, 2014, 167 (02) : 108 - 117
  • [35] Assessing ecological risk of invasive alien plants in South Korea
    Kil, JH
    Shim, KC
    Lee, HJ
    WEED TECHNOLOGY, 2004, 18 : 1490 - 1492
  • [36] Green Building Construction Projects in Singapore: Cost Premiums and Cost Performance
    Hwang, Bon-Gang
    Zhu, Lei
    Wang, Yinglin
    Cheong, Xinyi
    PROJECT MANAGEMENT JOURNAL, 2017, 48 (04) : 67 - 79
  • [37] Cost Analysis of a Mass Timber Building Project: Comparison of Budgeted and Actual Construction Cost
    Ahmed, Shafayet
    Arocho, Ingrid
    CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 493 - 501
  • [38] Assessing the Impacts of Individual and Organizational Factors on South Korea Hotels' Green Performance Using the AMO Model
    Kim, Taeuk
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2022, 19 (16)
  • [39] Cost Control System Building Based on Government Investment Construction Project
    Wu, Zhen-quan
    Liu, Fang
    Xu, Xiao-yun
    PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: INNOVATION AND PRACTICE IN INDUSTRIAL ENGINEERING AND MANAGEMENT (VOL 2), 2016, : 695 - 705
  • [40] Delay Factors in Building Construction Project of State Elementary School
    Haryo, Raden Risang C. D.
    Mulyadi, Lalu
    Iskandar, Tiong
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2020, 6 (03): : 523 - 530