Predicting Project Cost Performance Level by Assessing Risk Factors of Building Construction in South Korea

被引:11
|
作者
Cha, Hee Sung [1 ]
Shin, Kang Yong [1 ]
机构
[1] Ajou Univ, Dept Architectural Engn, Suwon 443749, South Korea
基金
新加坡国家研究基金会;
关键词
building project; cost performance; quantitative analysis; risk assessment;
D O I
10.3130/jaabe.10.437
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
There exists a strong relationship between the level of planning effort and overall project performance. Project stakeholders are concerned about various project objectives among which cost performance has long been regarded as one of the most crucial. Recognizing the lack of a systematic approach in assessing building project risk in association with cost performance prediction, this study identified 49 risk factors from various sources and quantified the relative impact of each factor. By normalizing these values, a Project Risk Score (PRS) has been developed for the purpose of predicting cost performance on a particular project. The 13 real case studies showed a statistically significant relationship between the PRS and cost performance. Predicting cost performance is not simple. Project managers must consider not only factors that are innate to the project, but also project-independent circumstances. This study provides straightforward guidance in assessing a particular project in order to recognize the level of cost performance before project execution. This risk-based performance prediction can improve early-stage project evaluation and enhances the possibility of achieving a sustainable business in a challenging environment.
引用
收藏
页码:437 / 444
页数:8
相关论文
共 50 条
  • [1] Quantitative approach for project performance measurement on building construction in South Korea
    Cha, Hee Sung
    Kim, Chan Kyu
    KSCE JOURNAL OF CIVIL ENGINEERING, 2011, 15 (08) : 1319 - 1328
  • [2] Quantitative approach for project performance measurement on building construction in South Korea
    Hee Sung Cha
    Chan Kyu Kim
    KSCE Journal of Civil Engineering, 2011, 15 : 1319 - 1328
  • [3] Time-cost relationships of building construction project in Korea
    Le-Hoai, Long
    Lee, Young Dai
    FACILITIES, 2009, 27 (13-14) : 549 - 559
  • [4] Measuring Project Performance in Consideration of Optimal Best Management Practices for Building Construction in South Korea
    Hee Sung Cha
    Ki Hyun Kim
    KSCE Journal of Civil Engineering, 2018, 22 : 1614 - 1625
  • [5] Measuring Project Performance in Consideration of Optimal Best Management Practices for Building Construction in South Korea
    Cha, Hee Sung
    Kim, Ki Hyun
    KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (05) : 1614 - 1625
  • [6] Assessing Construction Constraint Factors on Project Performance in the Construction Industry
    Masoetsa, Tshweu Given
    Ogunbayo, Babatunde Fatai
    Aigbavboa, Clinton Ohis
    Awuzie, Bankole Osita
    BUILDINGS, 2022, 12 (08)
  • [7] Analysis on building construction project cost
    Liu, Yilin
    Lu, Mei
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON EDUCATION TECHNOLOGY, MANAGEMENT AND HUMANITIES SCIENCE (ETMHS 2015), 2015, 27 : 1327 - 1331
  • [8] Cost of Climate Change: Risk of Building Loss from Typhoon in South Korea
    Kim, Ji-Myong
    Son, Seunghyun
    Lee, Sungho
    Son, Kiyoung
    SUSTAINABILITY, 2020, 12 (17)
  • [9] Data exploration on factors that influences construction cost and time performance on construction project sites
    Amusan, Lekan M.
    Afolabi, Adedeji
    Ojelabi, Raphael
    Omuh, Ignatius
    Okagbue, Hilary, I
    DATA IN BRIEF, 2018, 17 : 1320 - 1325
  • [10] Predicting Project Performance in the Construction Industry
    Assaad, Rayan
    El-Adaway, Islam H.
    Abotaleb, Ibrahim S.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (05)