Review of hydrology and spillway capacity of Simly Dam project

被引:0
|
作者
Izhar-ul-Haq
Zia-ul-Hassan
Abbas, ST
机构
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Simly Dam was built to supply drinking water to Islamabad, the Capital of Pakistan. During construction of the project, flood higher than the design flood was experienced. The hydrological data and design of existing spillway for safe passing of revised PMF was reviewed. the spillway capacity was found inadequate. It was decided to construct an auxiliary spillway on the saddle. Later on gates were installed on the existing service spillway to enhance the water supply from 24 MGD to 42 MGD. This paper describes the studies carried out to review the hydrology and spillway capacity of the project.
引用
收藏
页码:68 / 73
页数:6
相关论文
共 50 条
  • [1] Evaluating the spillway capacity of the morning glory spillway at harriman dam
    Gomez, Damian M.
    Gessler, Dan
    Donaghy, Justin
    2017 ASDSO - Dam Safety, Conference Proceedings, 2017, : 360 - 375
  • [2] Increasing spillway capacity at bee tree dam
    Basinger, DL
    Cannon, RP
    Bendel, RA
    REDUCING RISK FROM EXTREME EVENTS, 2003, : 353 - 361
  • [3] Spillway capacity upgrade at Malarce dam: Design of an additional Piano Key Weir spillway
    Pinchard, T.
    Boutet, J. -M.
    Cicero, G. M.
    LABYRINTH AND PIANO KEY WEIRS - PKW 2011, 2011, : 233 - 240
  • [4] Spillway capacity upgrade at Malarce dam: Construction of an additional piano key weir spillway
    Pinchard, T.
    Farges, J. -L.
    Boutet, J. -M.
    Lochu, A.
    Laugier, F.
    LABYRINTH AND PIANO KEY WEIRS II - PKW 2013, 2014, : 243 - 252
  • [5] Basic Aspects of the Design of Powerhouse and Spillway of the Merowe Dam Project
    Wiesemann, Jens-Uwe
    Weber, Joerg
    Zaid, Bahaeldeen A.
    WASSERWIRTSCHAFT, 2011, 101 (1-2) : 30 - 35
  • [6] Fonte serne dam. Increase of spillway discharge capacity
    Pinheiro, AN
    Marques, PR
    Matos, DS
    DAMS IN A EUROPEAN CONTEXT, 2001, : 511 - 516
  • [7] Cusset dam Spillway
    Barcouda, M
    Guene, C
    HOUILLE BLANCHE-REVUE INTERNATIONALE DE L EAU, 2004, (04): : 39 - 45
  • [8] Comprehensive Studies of the Discharge Capacity of the Spillway Dam of the Rublevsky Hydroelectric Scheme
    Belikov V.V.
    Kolesnikov Y.M.
    Power Technology and Engineering, 2024, 58 (01) : 72 - 79
  • [9] Experimental investigations for Telengiri dam spillway, irrigation project, Odisha–A case study
    Gadge P.P.
    Bhajantri M.R.
    Bhosekar V.V.
    ISH Journal of Hydraulic Engineering, 2021, 27 (01) : 1 - 8
  • [10] DAMAGE TO KARNAFULI DAM SPILLWAY
    BOWERS, CE
    TSAI, FY
    JOURNAL OF THE HYDRAULICS DIVISION-ASCE, 1974, 100 (NHY1): : 236 - 238