Spice: Is a capability maturity model applicable in the construction industry?

被引:0
|
作者
Sarshar, M [1 ]
Finnemore, M [1 ]
Haigh, R [1 ]
Goulding, J [1 ]
机构
[1] Univ Salford, Salford M5 4WT, Lancs, England
关键词
capability maturity model; construction process improvement; process maturity; supply chain processes;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Currently the UK construction industry is in search of continuous process improvement mechanisms, in order to improve quality and reduce construction time and costs. Likewise the software industry has been in search of process improvement frameworks, in the past decade. The Capability Maturity Model (CMM), developed by the Carnegie Mellon University, is one of the most widely adopted process improvement initiatives, within the software industry. Many of the basic process improvement concepts in CMM appear generic and could potentially be applied in construction. A recent research project at Salford University set itself the task of investigating if CMM is applicable in the construction industry. The project is titled SPICE (Standardised Process Improvement for Construction Enterprises). SPICE is in search of a systematic step by step process improvement framework for the construction industry. It investigates whether the CMM framework and concepts can be reused in construction SPICE has conducted several experiments to assess the applicability of CMM to the construction industry. So far the results show that most of the basic process improvement concepts of CMM are applicable. However, the CMM framework is not applicable in its current form. Much further research is needed to integrate the appropriate process improvement concepts from CMM and other research to develop a process improvement framework for the construction industry. In general the construction industry appears a more mature industry in its shared understanding of customs and working practices. Industry standards and data are more readily available. However, major problems stem from the supply chain arrangements. Also the cost of process improvement initiatives such as CMM may be too high for the construction SMEs, on most projects. This paper discusses the SPICE experiments undertaken to date. It high lights why the CMM framework can not be applied in construction in its present form and suggests future research directions.
引用
收藏
页码:2836 / 2843
页数:2
相关论文
共 50 条
  • [31] A framework for Service Innovation Capability Maturity Model
    Li, Eldon Y.
    Chen, Li-Wei
    Shen, Chien-Li
    PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON OPERATIONS AND SUPPLY CHAIN MANAGEMENT (ICOSCM 2010), 2010, 4 : 529 - 534
  • [32] Capability and Maturity Model for reuse: A Comparative Study
    Younoussi, Siham
    Roudies, Ounsa
    2016 2ND INTERNATIONAL CONFERENCE ON CLOUD COMPUTING TECHNOLOGIES AND APPLICATIONS (CLOUDTECH), 2016, : 302 - 308
  • [33] Digital Transformation Capability Maturity Model Framework
    Aguiar, Tomas
    Gomes, Silvia Bogea
    da Cunha, Paulo Rupino
    da Silva, Miguel Mira
    2019 IEEE 23RD INTERNATIONAL ENTERPRISE DISTRIBUTED OBJECT COMPUTING CONFERENCE (EDOC), 2019, : 51 - 57
  • [34] Carnegie Mellon's capability maturity model
    不详
    OIL & GAS JOURNAL, 2007, 105 (38) : 46 - 46
  • [35] Software team development in the Capability Maturity Model
    McGuire, EG
    ASSOCIATION FOR INFORMATION SYSTEMS - PROCEEDINGS OF THE FIFTH AMERICAS CONFERENCE ON INFORMATION SYSTEMS (AMCIS 1999), 1999, : 753 - 755
  • [36] Experiences with the Capability Maturity Model in a research environment
    vanderVelden, MJ
    Vreke, J
    vanderWal, B
    Symons, A
    SOFTWARE QUALITY JOURNAL, 1996, 5 (02) : 87 - 95
  • [37] A human factors integration capability maturity model
    Earthy, JV
    Bowler, Y
    Forster, M
    Taylor, R
    PEOPLE IN CONTROL, 1999, (463): : 320 - 326
  • [38] Complete Streets: A New Capability Maturity Model
    Jordan, Samuel W.
    Ivey, Stephanie
    Levy, Marian
    Lipinski, Martin
    Palazolo, Paul
    Waldron, Brian
    JOURNAL OF URBAN PLANNING AND DEVELOPMENT, 2022, 148 (01)
  • [39] Implementing the capability maturity model for software development
    Lowe, DE
    Cox, GM
    HEWLETT-PACKARD JOURNAL, 1996, 47 (04): : 6 - 14
  • [40] Transforming software organizations with the capability maturity model
    Arent, J
    PRODUCT FOCUSED SOFTWARE PROCESS IMPROVEMENT, 2000, 1840 : 103 - 114