Spice: Is a capability maturity model applicable in the construction industry?

被引:0
|
作者
Sarshar, M [1 ]
Finnemore, M [1 ]
Haigh, R [1 ]
Goulding, J [1 ]
机构
[1] Univ Salford, Salford M5 4WT, Lancs, England
关键词
capability maturity model; construction process improvement; process maturity; supply chain processes;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Currently the UK construction industry is in search of continuous process improvement mechanisms, in order to improve quality and reduce construction time and costs. Likewise the software industry has been in search of process improvement frameworks, in the past decade. The Capability Maturity Model (CMM), developed by the Carnegie Mellon University, is one of the most widely adopted process improvement initiatives, within the software industry. Many of the basic process improvement concepts in CMM appear generic and could potentially be applied in construction. A recent research project at Salford University set itself the task of investigating if CMM is applicable in the construction industry. The project is titled SPICE (Standardised Process Improvement for Construction Enterprises). SPICE is in search of a systematic step by step process improvement framework for the construction industry. It investigates whether the CMM framework and concepts can be reused in construction SPICE has conducted several experiments to assess the applicability of CMM to the construction industry. So far the results show that most of the basic process improvement concepts of CMM are applicable. However, the CMM framework is not applicable in its current form. Much further research is needed to integrate the appropriate process improvement concepts from CMM and other research to develop a process improvement framework for the construction industry. In general the construction industry appears a more mature industry in its shared understanding of customs and working practices. Industry standards and data are more readily available. However, major problems stem from the supply chain arrangements. Also the cost of process improvement initiatives such as CMM may be too high for the construction SMEs, on most projects. This paper discusses the SPICE experiments undertaken to date. It high lights why the CMM framework can not be applied in construction in its present form and suggests future research directions.
引用
收藏
页码:2836 / 2843
页数:2
相关论文
共 50 条
  • [21] A capability maturity model for digital investigations
    Kerrigan, Martin
    DIGITAL INVESTIGATION, 2013, 10 (01) : 19 - 33
  • [22] Process capability in the Australian software industry - Results from the SPICE trials
    Rout, TP
    Tuffley, AB
    Hodgen, DB
    1998 AUSTRALIAN SOFTWARE ENGINEERING CONFERENCE, PROCEEDINGS, 1998, : 12 - 19
  • [23] Development of a frontline H&S leadership maturity model in the construction industry
    Oswald, David
    Lingard, Helen
    SAFETY SCIENCE, 2019, 118 : 674 - 686
  • [24] The construction industry macro maturity model (CIM3): theoretical underpinnings
    Willis, Christopher J.
    Rankin, Jeffrey H.
    INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2012, 61 (04) : 382 - 402
  • [25] DEVELOPMENT OF A MATURITY MODEL FOR THE DIGITAL TRANSFORMATION OF COMPANIES IN THE CONTEXT OF CONSTRUCTION INDUSTRY 4.0
    Jaekel, Jan-Iwo
    Fischerkeller, Franziska
    Oberhoff, Tessa
    Klemt-Albert, Katharina
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2024, 29 : 778 - 809
  • [26] Information technology (IT) industry trends and adaptation of capability maturity model integration (CMMI) practices in Pakistan
    Noor, Tariq
    Ahmad, Jamil
    Zafar, Irfan
    ICIET 2007: PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION AND EMERGING TECHNOLOGIES, 2007, : 149 - +
  • [27] Adopting security maturity model to the organizations' capability model
    Al-Matari, Osamah M. M.
    Helal, Iman M. A.
    Mazen, Sherif A.
    Elhennawy, Sherif
    EGYPTIAN INFORMATICS JOURNAL, 2021, 22 (02) : 193 - 199
  • [28] A SPICE-Based Maturity Model for the Governance and Management of Green IT
    David Paton-Romero, J.
    Rodriguez, Moises
    Piattini, Mario
    SOFTWARE PROCESS IMPROVEMENT AND CAPABILITY DETERMINATION, SPICE 2017, 2017, 770 : 143 - 155
  • [29] A Brief Analysis of Construction of Innovation Capability Appraisal Model in Modern Service Industry
    Wu, Xiaoyun
    2013 3RD INTERNATIONAL CONFERENCE ON EDUCATION AND EDUCATION MANAGEMENT (EEM 2013), 2013, 27 : 345 - 348
  • [30] A New Reuse Capability and Maturity Model: An Overview
    Younoussi, Siham
    Roudies, Ounsa
    PROCEEDINGS OF 2018 INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING AND INFORMATION MANAGEMENT (ICSIM 2018) / WORKSHOP 2018 INTERNATIONAL CONFERENCE ON BIG DATA AND SMART COMPUTING (ICBDSC 2018), 2018, : 26 - 31