A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing

被引:54
|
作者
Sivakumar, AI
Chong, CS
机构
[1] Nanyang Technol Univ, Sch Mech & Prod Engn, Nanyang 639798, Singapore
[2] Gint Inst Mfg Technol, Nanyang 638075, Singapore
关键词
98 percentile cycle time; simulation; throughput; lot release scheduling; cycle time distribution; semiconductor manufacturing;
D O I
10.1016/S0166-3615(01)00081-1
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper presents a preliminary analysis of the relationship between selected input and output variables in semiconductor backend manufacturing system, using a data driven discrete event simulation model. This study is of interest and importance for a better understanding of the controllable input variables in an effort to reduce factory cycle time and distribution. Our analysis quantifies the effect of varying the input variables of lot release controls, heuristic machine dispatching rules, elimination of selected processes, material handling time, set-up time, and machine up time on selected output variables of throughput, cycle time and cycle time spread. Simulation model of a semiconductor site based in Singapore is used as the base case and the effects are quantified against the base model. (C) 2001 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:59 / 78
页数:20
相关论文
共 50 条
  • [31] LEAN MANUFACTURING AND CYCLE TIME VARIABILITY ANALYSIS FOR FACTORY AUTOMATION USING SIMULATION TOOLS
    Andrecioli, Ricardo
    Lin, Y. J.
    IMECE2008: PROCEEDINGS OF THE ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION, VOL 4: DESIGN AND MANUFACTURING, 2009, : 437 - 442
  • [32] SysML-based simulation framework for semiconductor manufacturing
    Kwon, Kysang
    McGinnis, Leon F.
    2007 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1-3, 2007, : 663 - 668
  • [33] Simulation based multiobjective schedule optimization in semiconductor manufacturing
    Gupta, AK
    Sivakumar, AI
    PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2002, : 1862 - 1870
  • [34] A Fuzzy Collaborative Sensor Network for Semiconductor Manufacturing Cycle Time Forecasting
    Lin, Yu-Cheng
    Chen, Toly
    Wang, Yu-Cheng
    INTERNATIONAL JOURNAL OF DISTRIBUTED SENSOR NETWORKS, 2013,
  • [35] Shortening of cycle time in semiconductor manufacturing via meaningful lot sizes
    Eberts, Dietrich
    Keil, Sophia
    Peipp, Frederik
    Lasch, Rainer
    2015 26TH ANNUAL SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE (ASMC), 2015, : 34 - 41
  • [36] Distribution Analysis in Manufacturing 2.0 Using Agent Based Modeling and Simulation
    Choi, Bodeum
    Kim, Yun Bae
    Park, Jinsoo
    Song, Kiburm
    Jung, Chul Woo
    ADVANCED METHODS, TECHNIQUES, AND APPLICATIONS IN MODELING AND SIMULATION, 2012, 4 : 95 - 104
  • [37] SIGNATURE ANALYSIS - SIMULATION OF INVENTORY, CYCLE TIME, AND THROUGHPUT TRADE-OFFS IN WAFER FABRICATION
    ATHERTON, RW
    DAYHOFF, JE
    IEEE TRANSACTIONS ON COMPONENTS HYBRIDS AND MANUFACTURING TECHNOLOGY, 1986, 9 (04): : 498 - 507
  • [38] Estimating manufacturing cycle time and throughput in flow shops with process drift and inspection
    Chincholkar, Mandar
    Herrmann, Jeffrey W.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (24) : 7057 - 7072
  • [39] DE SCHEDULING PREVENTIVE MAINTENANCE WITHIN A QUEUE TIME FOR MAXIMUM THROUGHPUT IN SEMICONDUCTOR MANUFACTURING
    Kalir, Adar A.
    Tirkel, Israel
    2016 WINTER SIMULATION CONFERENCE (WSC), 2016, : 2750 - 2761
  • [40] Simulation Based on Throughput Analysis of MVB
    Wang Yongxiang
    Wang Lide
    Nie Xiaobo
    PROCEEDINGS OF THE SECOND INTERNATIONAL SYMPOSIUM ON TEST AUTOMATION & INSTRUMENTATION, VOL. 3, 2008, : 1287 - 1292