Multi-objective Integrated Optimization Problem of Preventive Maintenance Planning and Flexible Job-Shop Scheduling

被引:5
|
作者
Jing, Zha [1 ]
Hua, Jin [1 ]
Yi, Zhu [1 ]
机构
[1] Three Gorges Univ, Coll Mech & Power Engn, Yichang 443002, Hubei, Peoples R China
基金
美国国家科学基金会;
关键词
Preventive maintenance; Flexible job shop scheduling; Integrated optimization; Improved genetic algorithm;
D O I
10.2991/978-94-6239-255-7_25
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In order to discuss the influence of equipment failure on the production schedule and equipment utilization rate in the pull production environment, a multi-objective integrated optimization problems of preventive maintenance planning and flexible job-shop scheduling model is established. The model is to minimize both the maximum completion time and the total equipment ' s workload. In this article an improved genetic algorithm is proposed to solve the problem. The multi-objective optimization model was compared with independent maintenance model to verify its superiority, and the multi-objective improved GA can find more Pareto solutions for the decision maker. Finally the example calculation shows that the integrated optimization can find the solution with shorter completion time, eliminate waste and improve production efficiency.
引用
收藏
页码:137 / 141
页数:5
相关论文
共 50 条
  • [31] Flexible Job Shop Scheduling Problem Based on Multi-Objective Optimization Algorithm
    Zhang, Li
    Wang, Lu
    PROCEEDINGS OF THE 2018 INTERNATIONAL CONFERENCE ON MECHANICAL, ELECTRONIC, CONTROL AND AUTOMATION ENGINEERING (MECAE 2018), 2018, 149 : 580 - 588
  • [32] Robust scheduling for multi-objective flexible job-shop problems with flexible workdays
    Zhang, Jiae
    Yang, Jianjun
    Zhou, Yong
    ENGINEERING OPTIMIZATION, 2016, 48 (11) : 1973 - 1989
  • [33] Scheduling of a flexible job-shop using a multi-objective genetic algorithm
    Agrawal, Rajeev
    Pattanaik, L. N.
    Kumar, S.
    JOURNAL OF ADVANCES IN MANAGEMENT RESEARCH, 2012, 9 (02) : 178 - 188
  • [34] Promoting Green and Sustainability: A Multi-Objective Optimization Method for the Job-Shop Scheduling Problem
    Liao, Wenzhu
    Wang, Tong
    SUSTAINABILITY, 2018, 10 (11)
  • [35] Multi-objective flexible job-shop scheduling based on learning effect
    Cao L.
    Ye C.
    Huang X.
    2023, CIMS (24): : 2023 - 2034
  • [36] Multi-Objective Optimization for Equal Batch Splitting Flexible Job-Shop Scheduling Problem with Multiple Process Flows
    Zeng, Qiang
    Yang, Yu
    Liang, Xuedong
    Ma, Jiaqi
    ADVANCED SCIENCE LETTERS, 2011, 4 (4-5) : 1808 - 1813
  • [37] Multi-objective dynamic scheduling algorithm for flexible job-shop problem based on rule orientation
    Zhu W.
    Zhu, Wei (314560255@qq.com), 1600, Systems Engineering Society of China (37): : 2690 - 2699
  • [38] A Newton-based heuristic algorithm for multi-objective flexible job-shop scheduling problem
    Miguel A. Fernández Pérez
    Fernanda M. P. Raupp
    Journal of Intelligent Manufacturing, 2016, 27 : 409 - 416
  • [39] An Effective Artificial Bee Colony Algorithm for Multi-objective Flexible Job-Shop Scheduling Problem
    Zhou, Gang
    Wang, Ling
    Xu, Ye
    Wang, Shengyao
    ADVANCED INTELLIGENT COMPUTING THEORIES AND APPLICATIONS: WITH ASPECTS OF ARTIFICIAL INTELLIGENCE, 2012, 6839 : 1 - 8
  • [40] Simulation Optimization of Multi-objective Flexible Job Shop Scheduling
    Wang Guicong
    Li Chuanpeng
    Cui Huanyong
    MACHINE DESIGN AND MANUFACTURING ENGINEERING II, PTS 1 AND 2, 2013, 365-366 : 602 - 605