Multi-objective Integrated Optimization Problem of Preventive Maintenance Planning and Flexible Job-Shop Scheduling

被引:5
|
作者
Jing, Zha [1 ]
Hua, Jin [1 ]
Yi, Zhu [1 ]
机构
[1] Three Gorges Univ, Coll Mech & Power Engn, Yichang 443002, Hubei, Peoples R China
基金
美国国家科学基金会;
关键词
Preventive maintenance; Flexible job shop scheduling; Integrated optimization; Improved genetic algorithm;
D O I
10.2991/978-94-6239-255-7_25
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In order to discuss the influence of equipment failure on the production schedule and equipment utilization rate in the pull production environment, a multi-objective integrated optimization problems of preventive maintenance planning and flexible job-shop scheduling model is established. The model is to minimize both the maximum completion time and the total equipment ' s workload. In this article an improved genetic algorithm is proposed to solve the problem. The multi-objective optimization model was compared with independent maintenance model to verify its superiority, and the multi-objective improved GA can find more Pareto solutions for the decision maker. Finally the example calculation shows that the integrated optimization can find the solution with shorter completion time, eliminate waste and improve production efficiency.
引用
收藏
页码:137 / 141
页数:5
相关论文
共 50 条
  • [21] A Multi-objective Memetic Algorithm for the Job-Shop Scheduling Problem
    Frutos, Mariano
    Tohme, Fernando
    OPERATIONAL RESEARCH, 2013, 13 (02) : 233 - 250
  • [22] A Multi-objective Memetic Algorithm for the Job-Shop Scheduling Problem
    Mariano Frutos
    Fernando Tohmé
    Operational Research, 2013, 13 : 233 - 250
  • [23] An improved multi-objective genetic algorithm for fuzzy flexible job-shop scheduling problem
    Wang, Xiaojuan
    Li, Wenfeng
    Zhang, Ying
    INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2013, 47 (2-3) : 280 - 288
  • [24] A cloud based improved method for multi-objective flexible job-shop scheduling problem
    Ning, Tao
    Jin, Hua
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2018, 35 (01) : 823 - 829
  • [25] A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities
    Li, Jun-Qing
    Pan, Quan-Ke
    Tasgetiren, M. Fatih
    APPLIED MATHEMATICAL MODELLING, 2014, 38 (03) : 1111 - 1132
  • [26] Study on Multi-objective Flexible Job-shop Scheduling Problem considering Energy Consumption
    Jiang, Zengqiang
    Zuo, Le
    Mingcheng E
    JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2014, 7 (03): : 589 - 604
  • [27] An object-oriented approach for multi-objective flexible job-shop scheduling problem
    Kaplanoglu, Vahit
    EXPERT SYSTEMS WITH APPLICATIONS, 2016, 45 : 71 - 84
  • [28] Improved NSGA-II for the multi-objective flexible job-shop scheduling problem
    Zhang C.
    Dong X.
    Wang X.
    Li X.
    Liu Q.
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2010, 46 (11): : 156 - 164
  • [29] An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems
    Xia, WJ
    Wu, ZM
    COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (02) : 409 - 425
  • [30] A Hybrid Optimization Algorithm for Multi-objective Flexible Job-shop
    Zhang Xiu-li
    Huang Yue
    Liu Nian
    2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 1524 - 1530