A Branch-and-Price Algorithm for Balancing Two-Sided Assembly Lines with Zoning Constraints

被引:1
|
作者
Yin, Qidong [1 ,2 ]
Luo, Xiaochuan [1 ,2 ]
Hohenstein, Julien [3 ]
机构
[1] Northeastern Univ, Coll Informat Sci & Engn, Shenyang 110819, Peoples R China
[2] Northeastern Univ, State Key Lab Synthet Automat Proc Ind, Shenyang 110819, Peoples R China
[3] BMW AG, iFactory Munich, D-80809 Munich, Germany
基金
国家重点研发计划; 中国国家自然科学基金;
关键词
GENETIC ALGORITHM; OPTIMIZATION ALGORITHM; PROGRAMMING APPROACH; MATHEMATICAL-MODEL; BOUND ALGORITHM; DESIGN;
D O I
10.1155/2021/4196228
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
Two-sided assembly lines are widely used in the large-size product manufacturing industry, especially for automotive assembly production. Balancing the assembly line is significant for assembly process planning and assembly production. In this study, we develop a novel and exact method to optimize the two-sided assembly line balancing problem with zoning constraints (TALBz), in which the aim is to minimize the number of mated-stations considering the task restrictions. A mixed-integer programming model is employed to exactly describe the TALBz problem. To strengthen the computational efficiency, we apply Dantzig-Wolfe decomposition to reformulate the TALBz problem. We further propose a branch-and-price (B&P) algorithm that integrates the column generation approach into a branch-and-bound frame. Both the benchmark datasets with zoning constraints and without zoning constraints are tested to evaluate the performance of the B&P algorithm. The numerical results show that our proposed approach can obtain optimal solutions efficiently on most cases. In addition, experiments on the real-world datasets originating from passenger vehicle assembly lines are conducted. The proposed B&P algorithm shows its advantage in tackling practical problems with the task restrictions. This developed methodology therefore provides insight for solving large-scale TALBz problems in practice.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] A multi-objective TLBO algorithm for balancing two-sided assembly line with multiple constraints
    Li, Dashuang
    Zhang, Chaoyong
    Shao, Xinyu
    Lin, Wenwen
    JOURNAL OF INTELLIGENT MANUFACTURING, 2016, 27 (04) : 725 - 739
  • [22] A multi-objective TLBO algorithm for balancing two-sided assembly line with multiple constraints
    Dashuang Li
    Chaoyong Zhang
    Xinyu Shao
    Wenwen Lin
    Journal of Intelligent Manufacturing, 2016, 27 : 725 - 739
  • [23] Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints
    Make, Muhammad Razif Abdullah
    Rashid, Mohd Fadzil Faisae
    Razali, Muhamad Magffierah
    INTERNATIONAL ENGINEERING RESEARCH AND INNOVATION SYMPOSIUM (IRIS), 2016, 160
  • [24] 2-ANTBAL: An ant colony optimisation algorithm for balancing two-sided assembly lines
    Simaria, Ana S.
    Vilarinho, Pedro M.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (02) : 489 - 506
  • [25] Balancing fuzzy multi-objective two-sided assembly lines via Bees Algorithm
    Ozbakir, Lale
    Tapkan, Pinar
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2010, 21 (05) : 317 - 329
  • [26] Balancing Mixed-Model Parallel Two-Sided Assembly Lines
    Zhang, David Z.
    Kucukkoc, Ibrahim
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IEEE-IESM 2013), 2013, : 391 - 401
  • [27] Two-sided assembly line balancing with operator number and task constraints: a hybrid imperialist competitive algorithm
    Wang, Baoxi
    Guan, Zailin
    Li, Dashuang
    Zhang, Chaoyong
    Chen, Lei
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 74 (5-8): : 791 - 805
  • [28] Two-sided assembly line balancing with operator number and task constraints: a hybrid imperialist competitive algorithm
    Baoxi Wang
    Zailin Guan
    Dashuang Li
    Chaoyong Zhang
    Lei Chen
    The International Journal of Advanced Manufacturing Technology, 2014, 74 : 791 - 805
  • [30] A Genetic Algorithm for solving two-sided assembly line balancing problems
    Taha, Raghda B.
    El-Kharbotly, Amin K.
    Sadek, Yomna M.
    Afia, Nahid H.
    AIN SHAMS ENGINEERING JOURNAL, 2011, 2 (3-4) : 227 - 240