Thermal Power Plant Sitting Based on TOPSIS method

被引:2
|
作者
Wang, Ting [1 ]
Xin, Bing Chuan [1 ]
机构
[1] N China Elect Power Univ, Dept Econ Management, Baoding 071003, Peoples R China
来源
CEIS 2011 | 2011年 / 15卷
关键词
power plant; TOPSIS method; location;
D O I
10.1016/j.proeng.2011.08.998
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Thermal power plant sitting is the prime step in the whole power plant design system. TOPSIS method is introduced. Analyzed how the idea is used in thermal power plant sitting problem combining quantitative indexes and qualitative indexes, and proved the validity of the model through a ease. (C) 2011 Published by Elsevier Ltd. Selection and/or peer-review under responsibility of [CEIS 2011]
引用
收藏
页数:5
相关论文
共 50 条
  • [31] Development of the performance deterioration diagnosis method to thermal power plant based on heat and mass balance analysis
    Takahashi, Toru
    Koda, Eiichi
    Nakao, Yoshinobu
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON POWER ENGINEERING 2009 (ICOPE-09), VOL 2, 2009, : 407 - 410
  • [32] Progress Delay Factors Analysis in Thermal Power Plant Ash Yard Project Based on PCA Method
    Wu Yunna
    Wang Jiali
    Li Jiangshuai
    Lai Zhiqiang
    MANUFACTURING SYSTEMS ENGINEERING, 2012, 429 : 217 - 221
  • [33] Improved AHP Based on Moody Chart Method and Its Application in the Evaluation of Thermal Power Plant Operation
    Wei, Le
    Yao, Wei
    PROCEEDINGS OF THE 30TH CHINESE CONTROL AND DECISION CONFERENCE (2018 CCDC), 2018, : 1777 - 1782
  • [34] The Construction Method of Environment Analysis and Evaluation System of Coastal Power Plant Thermal Discharge Based on GIS
    Guo, JingShan
    Guo, ZhongYang
    Ye, ShuFeng
    2014 INTERNATIONAL CONFERENCE ON GIS AND RESOURCE MANAGEMENT (ICGRM), 2014, : 45 - 52
  • [35] Risk-based decision making method for maintenance policy selection of thermal power plant equipment
    Carazas, F. G.
    Souza, G. F. M.
    ENERGY, 2010, 35 (02) : 964 - 975
  • [36] Progress Delay Factors Analysis in Thermal Power Plant Ash Yard Project Based on PCA Method
    Wu Yunna
    Li Jiangshuai
    Wang Jiali
    Lai Zhiqiang
    2010 INTERNATIONAL COLLOQUIUM ON COMPUTING, COMMUNICATION, CONTROL, AND MANAGEMENT (CCCM2010), VOL II, 2010, : 523 - 526
  • [37] Plant-wide predictive control for a thermal power plant based on a physical plant model
    Prasad, G
    Irwin, GW
    Swidenbank, E
    Hogg, BW
    IEE PROCEEDINGS-CONTROL THEORY AND APPLICATIONS, 2000, 147 (05): : 523 - 537
  • [38] Price Compensation Method for Promoting Thermal Power Plant to Participate in Peaking
    Chen, Dezhi
    Li, Hualin
    Liu, Fuchao
    2015 INTERNATIONAL CONFERENCE ON NEW ENERGY SCIENCE AND RESEARCH (ICESR 2015), 2015, : 170 - 176
  • [39] Thermal Power Plant Circulating Water Flow Measurement Method Research
    Wang, Zhengxian
    Guo, Baoren
    Zhang, Min
    Yang, Jianyong
    Liu, Li
    ENERGY ENGINEERING AND ENVIRONMENTAL ENGINEERING, PTS 1AND 2, 2013, 316-317 : 1143 - 1146
  • [40] Practical application of risk based management in thermal power plant
    Smith, Christopher
    Simandjuntak, Sarinova
    BALTICA VIII: LIFE MANAGEMENT AND MAINTENANCE FOR POWER PLANTS, VOL 1, 2010, 264 : 308 - 323