Thermal Power Plant Sitting Based on TOPSIS method

被引:2
|
作者
Wang, Ting [1 ]
Xin, Bing Chuan [1 ]
机构
[1] N China Elect Power Univ, Dept Econ Management, Baoding 071003, Peoples R China
来源
CEIS 2011 | 2011年 / 15卷
关键词
power plant; TOPSIS method; location;
D O I
10.1016/j.proeng.2011.08.998
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Thermal power plant sitting is the prime step in the whole power plant design system. TOPSIS method is introduced. Analyzed how the idea is used in thermal power plant sitting problem combining quantitative indexes and qualitative indexes, and proved the validity of the model through a ease. (C) 2011 Published by Elsevier Ltd. Selection and/or peer-review under responsibility of [CEIS 2011]
引用
收藏
页数:5
相关论文
共 50 条
  • [21] TOPSIS Method Based on Entropy Weight for Supplier Evaluation of Power Grid Enterprise
    Zhang, Yanfu
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON EDUCATION REFORM AND MODERN MANAGEMENT (ERMM 2015), 2015, 15 : 334 - 337
  • [22] Comprehensive energy efficiency evaluation of municipal power grid based on TOPSIS method
    Du, Jian
    Cai, Chao
    Xie, Zhenjian
    Geng, Mingzhi
    2020 5TH ASIA CONFERENCE ON POWER AND ELECTRICAL ENGINEERING (ACPEE 2020), 2020, : 829 - 833
  • [23] Evaluation of the Profitability of Power Listed Companies Based on Entropy Improved TOPSIS Method
    Dai, Lixin
    Wang, Jianfang
    CEIS 2011, 2011, 15
  • [24] Evaluation of New Power System Based on Entropy Weight-TOPSIS Method
    Liu, Yang
    Wang, Yunling
    Li, Ting
    Ma, Ruiguang
    Xu, Ke
    Xu, Weiting
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [25] Evaluation of New Power System Based on Entropy Weight-TOPSIS Method
    Liu, Yang
    Wang, Yunling
    Li, Ting
    Ma, Ruiguang
    Xu, Ke
    Xu, Weiting
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [26] Application of TOPSIS Analysis Method Based on AHP in Bid Evaluation of Power Equipment
    Jiang, Chen Zhao
    Yan, Zhang
    2010 2ND IEEE INTERNATIONAL CONFERENCE ON INFORMATION AND FINANCIAL ENGINEERING (ICIFE), 2010, : 193 - 196
  • [27] Power Plant Project Risk Assessment Using a Fuzzy-ANP and Fuzzy-TOPSIS Method
    Zegordi, S. H.
    Nik, E. Rezaee
    Nazari, A.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2012, 25 (02): : 107 - 120
  • [28] Plant location selection based on fuzzy TOPSIS
    Yong, Deng
    International Journal of Advanced Manufacturing Technology, 2006, 28 (7-8): : 839 - 844
  • [29] Plant location selection based on fuzzy TOPSIS
    Deng Yong
    The International Journal of Advanced Manufacturing Technology, 2006, 28 : 839 - 844
  • [30] Plant location selection based on fuzzy TOPSIS
    Yong, D
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 28 (7-8): : 839 - 844