共 50 条
- [41] A Temporal Constraint based Planning Approach for City Tour and Travel Plan Generation 4TH INTERNATIONAL CONFERENCE ON INTELLIGENT HUMAN COMPUTER INTERACTION (IHCI 2012), 2012,
- [42] Generation of assembly precedence constraint based on knowledge Ruan Jian Xue Bao, 7 (487-495):
- [43] A converse method-based approach for assembly sequence planning with assembly tool INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 69 (5-8): : 1359 - 1371
- [44] A converse method-based approach for assembly sequence planning with assembly tool The International Journal of Advanced Manufacturing Technology, 2013, 69 : 1359 - 1371
- [45] COMPUTER-AIDED PLANNING METHOD FOR A LUBRICANT REFINERY ERDOL & KOHLE ERDGAS PETROCHEMIE, 1995, 48 (02): : 87 - 93
- [46] PDM-integrated computer-aided assembly process planning 16TH INTERNATIONAL CONFERENCE ON COMPUTER-AIDED PRODUCTION ENGINEERING - CAPE 2000, 2000, 2000 (05): : 307 - 316
- [47] Assembly sequence planning method based on semantic engineering information and precedence constraint matrix Xitong Fangzhen Xuebao, 2008, 19 (5262-5267):
- [48] Layout planning in assembly line kitting - a constraint programming approach 2021 26TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION (ETFA), 2021,
- [49] Method for automatic generation of exploded view based on assembly sequence planning Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2010, 46 (21): : 149 - 157
- [50] A computer aided assembly sequence evaluation method based on the fuzzy theory for the complex products ADVANCED DESIGN TECHNOLOGY, 2012, 421 : 381 - 387