Assembly sequence planning method based on semantic engineering information and precedence constraint matrix

被引:0
|
作者
National CIMS Engineering Research Centre, Tsinghua University, Beijing 100084, China [1 ]
不详 [2 ]
机构
来源
Xitong Fangzhen Xuebao | 2008年 / 19卷 / 5262-5267期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Precedence Constraint Knowledge-based Assembly Sequence Planning for Open-Architecture Products
    Ma, Hongqin
    Peng, Qingjin
    Zhang, Jian
    Gu, Peihua
    9TH INTERNATIONAL CONFERENCE ON DIGITAL ENTERPRISE TECHNOLOGY - INTELLIGENT MANUFACTURING IN THE KNOWLEDGE ECONOMY ERA, 2016, 56 : 7 - 12
  • [2] Assembly sequence concomitant planning method based for the variation of constraint
    Zhao L.
    Li Y.
    Yu J.
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2011, 47 (05): : 149 - 155
  • [3] Optimizing assembly sequence planning using precedence graph-based assembly subsets prediction method
    Zhang, Nan
    Liu, Zhenyu
    Qiu, Chan
    Hu, Weifei
    Tan, Jianrong
    ASSEMBLY AUTOMATION, 2020, 40 (02) : 361 - 375
  • [4] A weighted assembly precedence graph for assembly sequence planning
    Wang, Yong
    Tian, De
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 83 (1-4): : 99 - 115
  • [5] A weighted assembly precedence graph for assembly sequence planning
    Yong Wang
    De Tian
    The International Journal of Advanced Manufacturing Technology, 2016, 83 : 99 - 115
  • [6] Assembly stability as a constraint for assembly sequence planning
    Mosemann, H
    Rohrdanz, F
    Wahl, F
    1998 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1-4, 1998, : 233 - 238
  • [7] Generation of assembly precedence constraint based on knowledge
    Tsinghua Univ, Beijing, China
    Ruan Jian Xue Bao, 7 (487-495):
  • [8] AUTOMATIC PRECEDENCE CONSTRAINT GENERATION FOR ASSEMBLY SEQUENCE PLANNING USING A THREE-DIMENSIONAL SOLID MODEL
    Alfadhlani
    Samadhi, T. M. A. Ari
    Ma'ruf, Anas
    Toha, Isa Setiasyah
    INTERNATIONAL JOURNAL OF TECHNOLOGY, 2019, 10 (02) : 339 - 350
  • [9] Constraint evaluation for assembly sequence planning
    Rohrdanz, F
    Mosemann, H
    Wahl, FM
    1997 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP'97) - TOWARDS FLEXIBLE AND AGILE ASSEMBLY AND MANUFACTURING, 1997, : 263 - 268
  • [10] INTEGRATED APPROACH TO GENERATION OF PRECEDENCE RELATIONS AND PRECEDENCE GRAPHS FOR ASSEMBLY SEQUENCE PLANNING
    Niu Xinwen Ding Han Xiong YoulunSchool of Mechanical Science and Engineering
    Chinese Journal of Mechanical Engineering(English Edition), 2002, (03) : 193 - 198