A stochastic-interval model for optimal scheduling of PV-assisted multi-mode charging stations

被引:37
|
作者
Tostado-Veliz, Marcos [1 ]
Kamel, Salah [2 ]
Hasanien, Hany M. [3 ]
Arevalo, Paul [1 ]
Turky, Rania A. [4 ]
Jurado, Francisco [1 ]
机构
[1] Univ Jaen, Dept Elect Engn, Linares 23700, Spain
[2] Aswan Univ, Fac Engn, Dept Elect Engn, Aswan 81542, Egypt
[3] Ain Shams Univ, Fac Engn, Elect Power & Machines Dept, Cairo 11517, Egypt
[4] Future Univ Egypt, Fac Engn & Technol, Elect Engn Dept, Cairo, Egypt
关键词
Photovoltaic; Charging station; Electric vehicle; Renewable energy; Interval optimization; Robust optimization; ENERGY MANAGEMENT-SYSTEM; ELECTRIC VEHICLE; STORAGE;
D O I
10.1016/j.energy.2022.124219
中图分类号
O414.1 [热力学];
学科分类号
摘要
Nowadays, photovoltaic-assisted charging stations are becoming popular worldwide because its capacity to accommodate more clean energy, reduce carbon emissions, alleviate peak charging loads and provide wider charging infrastructures worldwide. When these infrastructures are operated locally, energy management becomes a challenge due to the large number and heterogeneity of uncertainties involved. This aspect is especially noticeable in the case of charging demand, which is difficult to predict. To address this issue, this paper develops a novel stochastic-interval model for optimal scheduling of multimode photovoltaic-assisted charging stations. The developed model uses interval formulation to model uncertainties from photovoltaic generation and energy price, while a comprehensive stochastic model is proposed for charging demand. The developed optimal scheduling model is solved using a developed iterative model, which avoids using interval arithmetic explicitly. This methodology encompasses two Mixed-integer linear programming problems and one Quadratic-programming problem, that can be efficiently addressed by conventional solvers, and allows adopting optimistic or pessimistic strategies. A case study is presented on a benchmark mid-size charging station to validate the developed model. As a sake of example, the system profit grows by 9% and decreases by 3% adopting optimistic and pessimistic point of view, respectively. Likewise, total PV generation increases by 150 kWh/day and reduces by 50 kWh/day. Similar conclusions are extracted for other parameters like monetary balances, PV peak power or satisfied EV demand.
引用
收藏
页数:13
相关论文
共 50 条
  • [21] Decentralized collaborative optimal scheduling for EV charging stations based on multi-agent reinforcement learning
    Li, Hang
    Han, Bei
    Li, Guojie
    Wang, Keyou
    Xu, Jin
    Khan, Muhammad Waseem
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2024, 18 (06) : 1172 - 1183
  • [22] A Stochastic Optimal Planning Model for Fully Green Stand-Alone PEV Charging Stations
    Moradzadeh, Majid
    Abdelaziz, Morad Mohamed Abdelmageed
    IEEE TRANSACTIONS ON TRANSPORTATION ELECTRIFICATION, 2021, 7 (04): : 2356 - 2375
  • [23] An interval-based model for stochastic optimal scheduling of multi carrier energy hubs in the presence of multiple sources of uncertainty
    Dolatnia, Armin
    Sarvari, Pouya
    Sarmadi, Behnam Karim
    Baghramian, Alfred
    ELECTRIC POWER SYSTEMS RESEARCH, 2025, 242
  • [24] An Edge Computing-oriented Net Power Forecasting for PV-assisted Charging Station: Model Complexity and Forecasting Accuracy Trade-off
    Shi, Jiaqi
    Liu, Nian
    Huang, Yujing
    Ma, Liya
    APPLIED ENERGY, 2022, 310
  • [25] A Multi-Objective Design Approach for PV-Battery Assisted Fast Charging Stations Based on Real Data
    Vermeer, Wiljan
    Mouli, Gautham Ram Chandra
    Bauer, Pavol
    2022 IEEE/AIAA TRANSPORTATION ELECTRIFICATION CONFERENCE AND ELECTRIC AIRCRAFT TECHNOLOGIES SYMPOSIUM (ITEC+EATS 2022), 2022, : 114 - 118
  • [26] Generalised soft multi-mode real options model (fuzzy-stochastic approach)
    Zmeskal, Zdenek
    Dluhosova, Dana
    Gurny, Petr
    Kresta, Ales
    EXPERT SYSTEMS WITH APPLICATIONS, 2022, 192
  • [27] An interval-stochastic programming based approach for a fully uncertain multi-objective and multi-mode resource investment project scheduling problem with an application to ERP project implementation
    Subulan, Kemal
    EXPERT SYSTEMS WITH APPLICATIONS, 2020, 149 (149)
  • [28] Generalised soft multi-mode real options model (fuzzy-stochastic approach)
    Zmeškal, Zdeněk
    Dluhošová, Dana
    Gurný, Petr
    Kresta, Aleš
    Expert Systems with Applications, 2022, 192
  • [29] A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags
    Sabzehparvar, Majid
    Seyed-Hosseini, S. Mohammad
    JOURNAL OF SUPERCOMPUTING, 2008, 44 (03): : 257 - 273
  • [30] A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags
    Majid Sabzehparvar
    S. Mohammad Seyed-Hosseini
    The Journal of Supercomputing, 2008, 44 : 257 - 273