Application of Relationship Diagramming Method (RDM) for resource-constrained scheduling of linear construction projects

被引:1
|
作者
Maheswari, J. Uma [1 ]
Charlesraj, V. Paul C. [2 ]
Goyal, Anshul [1 ]
Mujumdar, Purva [1 ]
机构
[1] Indian Inst Technol Delhi, Dept Civil Engn, New Delhi 110016, India
[2] RICS Sch Built Environm, Sch Construct, Delhi Ncr 201313, India
关键词
critical path; reason/why code; relationship diagramming method; repetitive construction projects; resource-constrained project scheduling;
D O I
10.1016/j.proeng.2015.10.095
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The traditional techniques for project scheduling such as Arrow Diagramming Method (ADM) and Precedence Diagramming Method (PDM) are continuously undergoing improvisation in order to replicate real-time construction scenario. Quite often, these methods are criticized for their limited information capturing ability. Relationship Diagramming Method (RDM) proposed by Plotnick in the recent past, is an improved variant of PDM, which can store additional information on relationships that would improve the scheduling process. In addition to basic data on the activities, additional information can be represented through five codes in RDM. Sequencing of activities in a construction project is primarily driven by the construction logic and/or the availability of resources. There is scope for arriving at alternate sequences with varying availability of resources to achieve the objectives of project scheduling as long as the construction logic is preserved. In order to achieve such a resource-constrained project scheduling, additional information on the restraints of the activities are necessary, which can be modelled using RDM through one of the five codes of RDM. The objective of this paper is to explore and exploit the Reason/Why code of RDM. The Reason and Why codes are associated with a restraint and for recording the description respectively. An activity's dependence on a resource has been captured using Reason/Why code in this study. It has been attempted to understand the impact of varying resource availability using an empirical equation on sequencing such resource dependent activities and its effect on critical path. The proposed concept is tested with data from a repetitive high rise construction project. The preliminary results have been well received. (C) 2015 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:308 / 315
页数:8
相关论文
共 50 条
  • [31] Batch scheduling in process industries: An application of resource-constrained project scheduling
    Schwindt C.
    Trautmann N.
    OR-Spektrum, 2000, 22 (4) : 501 - 524
  • [32] Batch scheduling in process industries: an application of resource-constrained project scheduling
    Schwindt, C
    Trautmann, N
    OR SPEKTRUM, 2000, 22 (04) : 501 - 524
  • [33] A linear-discrete scheduling model for the resource-constrained project scheduling problem
    Bonnal, Pierre
    Gourc, Didier
    Hameri, Ari-Pekka
    Lacoste, Germain
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (08) : 797 - 814
  • [34] Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects
    Heravi, Gholamreza
    Moridi, Saeed
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (08) : 3265 - 3274
  • [35] Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects
    Gholamreza Heravi
    Saeed Moridi
    KSCE Journal of Civil Engineering, 2019, 23 : 3265 - 3274
  • [36] Novel Hybrid Method in Time–Cost Trade-Off for Resource-Constrained Construction Projects
    Gülçağ Albayrak
    Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2020, 44 : 1295 - 1307
  • [37] Investing the Application of Resource-Constrained Project Scheduling Problem in a Single-Mode Construction Project
    Devagekar, Priyanka
    Balasubramanian, M.
    ADVANCES IN CONSTRUCTION MANAGEMENT, ACMM 2021, 2022, 191 : 513 - 522
  • [38] On a resource-constrained scheduling problem with application to distributed systems reconfiguration
    Sirdey, Renaud
    Carlier, Jacques
    Kerivin, Herv
    Nace, Dritan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 183 (02) : 546 - 563
  • [39] Research on Single Critical Resource-Constrained Multiple Projects Scheduling Problem Based on Critical Chain Method
    Hu Xin-bu
    Xu-yu
    He Zheng-wen
    Xun Shun-li
    ICOSCM 2007 - INTERNATIONAL CONFERENCE ON OPERATIONS AND SUPPLY CHAIN MANAGEMENT IN CHINA, 2007, 1
  • [40] Reasearch on Single Critical Resource-Constrained Multiple Projects Scheduling Problem Based on Critical Chain Method
    Hu Xin-bu
    Zhao Fen-ni
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2975 - 2978