Reasearch on Single Critical Resource-Constrained Multiple Projects Scheduling Problem Based on Critical Chain Method

被引:0
|
作者
Hu Xin-bu [1 ]
Zhao Fen-ni [1 ]
机构
[1] Engn Coll Armied Police Forces, Xian 710086, Peoples R China
关键词
Critical Chain Method; Single Critical Resource; Multiple Projects; Scheduling optimize; Buffer;
D O I
10.4028/www.scientific.net/AMM.174-177.2975
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In view of the characteristic of the Single Critical Resource-Constrained Multiple Projects Scheduling Problem, the paper first describes the SCRCMPSP, then establishes the model upon SCRCMPSP based on the Critical Chain Method and designs the corresponding arithmetic, at the same time it puts forward an Arithmetic flow for the Problem. In order to verify degree of adaptability of model and calculate way, the thesis selects a real examinations form the engineering in the related cultural heritage to carry on solving and analyses, it prove the model and calculate way's opposite to the traditional item progress' method is more valid.
引用
收藏
页码:2975 / 2978
页数:4
相关论文
共 50 条
  • [1] Research on Single Critical Resource-Constrained Multiple Projects Scheduling Problem Based on Critical Chain Method
    Hu Xin-bu
    Xu-yu
    He Zheng-wen
    Xun Shun-li
    ICOSCM 2007 - INTERNATIONAL CONFERENCE ON OPERATIONS AND SUPPLY CHAIN MANAGEMENT IN CHINA, 2007, 1
  • [2] Solving the resource-constrained multi-project scheduling problem with an improved critical chain method
    Tian, Min
    Liu, Ren Jing
    Zhang, Guang Jun
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2020, 71 (08) : 1243 - 1258
  • [3] Scheduling of resource-constrained projects
    Zilinskas, A
    INTERFACES, 2001, 31 (04) : 133 - 135
  • [4] Scheduling of resource-constrained projects
    Wilson, J
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2001, 52 (07) : 846 - 846
  • [5] Critical chain based Proactive-Reactive scheduling for Resource-Constrained project scheduling under uncertainty
    Peng, Wuliang
    Lin, Xuejun
    Li, Haitao
    EXPERT SYSTEMS WITH APPLICATIONS, 2023, 214
  • [6] Resource-Constrained Critical Path Scheduling by a GRASP-Based Hyperheuristic
    Anagnostopoulos, Konstantinos
    Koulinas, Georgios
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2012, 26 (02) : 204 - 213
  • [7] Resource-constrained scheduling in repetitive projects
    Zhang, Li-hui
    Zou, Xin
    Chen, Xin-lu
    Advances in Information Sciences and Service Sciences, 2012, 4 (14): : 287 - 294
  • [8] Performance analysis of scheduling rules in resource-constrained multiple projects
    Kanagasabapathi, Balasubramanian
    Rajendran, Chandrasekharan
    Ananthanarayanan, Kuppuswamy
    International Journal of Industrial and Systems Engineering, 2009, 4 (05) : 502 - 535
  • [9] Critical Sequences and Resource Links Optimization in Resource-Constrained Project Scheduling
    Cui, Wan-An
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2018, 35 (05)
  • [10] Resource-constrained project scheduling:: A critical activity reordering heuristic
    Valls, V
    Quintanilla, S
    Ballestín, F
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (02) : 282 - 301